Pulsed field-reversed-configuration fusion with D-He3 fuel; signed the world's first commercial fusion electricity PPA (Microsoft, 2023)
Microsoft Fusion PPA
50 MW by 2028
May 2023; world's first commercial fusion electricity PPA; non-delivery penalties (terms undisclosed)
Valuation (Q3 2025 reported)
$5.4B
+13% from $4.8B in Jan 2024
Approach
Pulsed FRC + D-He3
Only major fusion developer pursuing direct-energy capture + aneutronic-leaning fuel cycle
Polaris Generation
7th machine
Each generation has demonstrated material physics advances; cumulative ~$1.5B invested across 12 years
Total raised: ~$1.5B+ · Latest valuation: $5.4B (reported Q3 2025)
| Round | Date | Amount | Valuation | Key Investors |
|---|---|---|---|---|
| Pre-Seed / Y Combinator | 2014 | $1.5M | — | Y CombinatorMithril CapitalCapricorn Investment Group |
| Series A / B | 2015-2019 | $77M cumulative | — | Mithril CapitalCapricornDustin MoskovitzPeter Thiel |
| Series C | Nov 2021 | $500M | $3B | Sam Altman (lead, personal)Mithril CapitalDustin MoskovitzReid Hoffman+2 more |
| Series E | Jan 2024 | $425M | $4.8B | Sam Altman (personal)MithrilCapricornBlackRock+1 more |
| Series F (reported) | Q3 2025 | ~$1B (reported) | $5.4B | Existing investors (per Reuters) |
| System | Type | Status |
|---|---|---|
| Polaris (7th gen) | Pulsed FRC fusion machine with direct-energy capture | Under construction / commissioning at Everett, WA |
| Trenta (6th gen) | Prior-gen prototype achieving 100M C plasma | Decommissioned but published as reference |
| D-He3 Fuel Cycle | Aneutronic-leaning fuel approach (deuterium + helium-3) | R&D; targets reduced neutron flux + direct energy conversion |
| Direct Energy Capture | Skips steam turbine via inductive plasma deceleration | R&D; key differentiator from tokamak / NIF approaches |
| Microsoft Plant (planned) | 50 MW commercial fusion plant for Microsoft PPA | Site selection underway; target 2028 delivery |
May 2023 power purchase agreement: 50 MW delivery by 2028 with non-delivery penalties; world's first commercial fusion electricity contract.
Sep 2024 MoU for 500 MW fusion plant for Nucor steel-mill operations; non-binding development agreement.
Largest individual backer; led Series C; remains Executive Chairman during OpenAI CEO tenure.
Series E investor; one of few mainstream asset managers in deep fusion. Signals later-stage institutional acceptance.
Series E investor; ties to broader AI-power capacity thesis.
Earliest backers (2014 onward); maintained position through all subsequent rounds.
David Kirtley, Chris Pihl, John Slough, George Votroubek spin Helion out of MSNW research
First device to reach commercial-relevant 100M C plasma temperature
Sam Altman personally leads $500M round; becomes Executive Chairman
World's first commercial fusion electricity power purchase agreement: 50 MW delivery to Microsoft by 2028, with penalties for non-delivery
$425M raise post Microsoft PPA; BlackRock and SoftBank join
7th-generation machine assembly begins at Everett, WA; targeted as first device to demonstrate net electricity production
Initial pulse testing of Polaris underway; electricity demonstration timeline revised from original 2024 target
Approximately $1B follow-on per Reuters; Polaris scale-up funding
Contractual delivery date for Microsoft PPA; the most consequential near-term fusion commercial milestone