1968
Milestone
Robert Noyce and Gordon Moore found Intel, which is incorporated in California in 1968 (Intel Form 10-K, filed February 1, 2019).
1971
Launch
Intel launches the 4004, which it calls the world's first commercially available microprocessor (Intel 2019 proxy statement, filed April 3, 2019).
1978
Launch
Intel launches the 8086 microprocessor in 1978. Not confirmed in a primary source as of 2026-10-31: the launch year.
Aug 1981
Commercial
IBM unveils the IBM PC at New York's Waldorf Hotel on August 12, 1981, built on Intel's 8088 chip (IBM Heritage page "The IBM PC", ibm.com/history/personal-computer).
1985
Launch
Intel launches the Intel386 microprocessor in 1985. Not confirmed in a primary source as of 2026-10-31: the launch year.
1985
Paused
Intel exits the DRAM business, which it calls fundamental to its early success, to concentrate on microprocessors (Intel 2019 proxy statement, filed April 3, 2019).
1987
Milestone
Andrew Grove becomes Intel's chief executive in 1987 (Intel Form 10-K, filed March 28, 1995).
1989
Launch
Intel launches the Intel486 microprocessor in 1989. Not confirmed in a primary source as of 2026-10-31: the launch year.
1993
Launch
Intel introduces the 60- and 66-MHz Pentium processors in 1993, rated at up to 112 million instructions per second (Intel Form 10-K, filed March 25, 1994).
1994
Paused
Intel takes a $475 million charge in the fourth quarter of 1994 for replacement costs and inventory writedown tied to a divide problem in the Pentium floating point unit (Intel Form 10-K, filed March 28, 1995).
May 1997
Launch
Intel launches the Pentium II processor in May 1997, introduced at 233, 266 and 300 MHz (Intel Form 10-K, filed March 27, 1998).
Jul 2006
Launch
Intel introduces the first mobile processors based on its Core microarchitecture in July 2006, the Core 2 Duo, built on 65-nanometer process technology and running at up to 2.33 GHz (Intel Form 10-K, filed February 26, 2007).
2008
Launch
Intel introduces the Atom processor family in 2008, low-power processors for embedded solutions, MIDs, netbooks and nettops (Intel Form 10-K, filed February 23, 2009).
Apr 2018
Paused
Intel says in its April 26, 2018 first-quarter results that it is shipping low-volume 10 nm product and now expects 10 nm volume production to shift to 2019 (Intel Form 8-K, April 26, 2018, Exhibit 99.1).
Jun 2018
Paused
Intel announces on June 21, 2018 that CEO Brian Krzanich resigned on June 20 and that the board named CFO Robert Swan interim CEO (Intel Form 8-K, June 21, 2018).
Jul 2019
Milestone
Intel says on July 25, 2019 that its 10nm-based 10th Gen Core processors, code-named Ice Lake, are now shipping and expected to be in volume systems on retail shelves in the 2019 holiday selling season (Intel Form 8-K, July 25, 2019, Exhibit 99.1).
Dec 2019
Milestone
Intel acquires Habana Labs, an Israeli developer of deep learning accelerators for the data center, on December 12, 2019, with total consideration of $1.7 billion (Intel Form 10-K for 2019, filed January 24, 2020).
Feb 2021
Milestone
Intel announces on January 13, 2021 that its board appointed Pat Gelsinger, VMware's CEO since September 2012, as Intel's CEO effective February 15, 2021 (Intel Form 8-K, January 14, 2021).
Mar 2021
Expansion
Intel CEO Pat Gelsinger announces the IDM 2.0 manufacturing strategy on March 23, 2021, including a new Intel Foundry Services unit and an estimated $20 billion investment in two new fabs in Arizona (Intel Form 8-K, March 23, 2021, Exhibit 99.1).
Jan 2022
Expansion
Intel announced on January 21, 2022 that it had chosen a site in Licking County, Ohio for two new leading-edge chip factories, an initial investment of more than $20B with the factories to be built by 2025; CEO Pat Gelsinger called it Intel's first new manufacturing site in 40 years (Ohio Governor's release, January 21, 2022; Intel Form 8-K, January 26, 2022, Exhibit 99.1). President Biden said on May 6, 2022 that Intel's CEO had told him the Ohio investment would rise from $20B to $100B if the CHIPS legislation passed (White House remarks, May 6, 2022).
Aug 2022
Regulatory
The CHIPS and Science Act became law on August 9, 2022 as part of Public Law 117-167. The White House said it provides $52.7B for American semiconductor research, development, manufacturing and workforce development, including $39B in manufacturing incentives, $13.2B in R&D and workforce development and $500M for international information and communications technology security and semiconductor supply chain activities (Public Law 117-167, H.R. 4346, August 9, 2022; White House fact sheet, August 9, 2022).
Sep 2022
Expansion
Intel broke ground on its Ohio site in Licking County on September 9, 2022, with President Biden speaking at the event; the January 2022 plan called for two factories to be built by 2025 (White House remarks, September 9, 2022; Intel Form 10-K for 2022, filed January 27, 2023; Ohio Governor's release, January 21, 2022). Intel's 10-K for 2024 says it delayed construction or expansion projects in Ohio, Germany, Poland, Malaysia and Israel, and its 10-K for 2025 says it slowed the pace of construction of the Ohio fab (Intel Form 10-K for 2024, filed January 31, 2025, and for 2025, filed January 23, 2026).
Oct 2022
Milestone
Mobileye's Class A shares began trading on Nasdaq on October 26, 2022 after an IPO of 41,000,000 shares at $21.00, about $861M before the underwriters' option; the IPO closed on October 28, Mobileye also sold 4,761,905 shares to General Atlantic for $100M, and the underwriters bought their option shares on November 1 (Mobileye Form 8-K, October 28 and November 1, 2022; Mobileye Form 10-K for 2022, filed March 9, 2023). Intel holds all of the Class B shares, which carry ten votes each and gave it about 99.3% of the voting power at December 31, 2022, and Intel acquired Mobileye in 2017 for $15.3B (Mobileye Form 10-K for 2022).
Sep 2023
Milestone
Intel leaders announced on September 29, 2023, at Fab 34 in Leixlip, Ireland, the start of high-volume manufacturing on Intel 4, made possible by EUV (Intel Newsroom, September 29, 2023). Intel's third-quarter 10-Q says its Ireland fab began high-volume production of Intel 4, the first use of EUV in high-volume manufacturing in Europe, and its Q3 release called Intel 4 the company's first node using EUV and said the Meteor Lake processor, sold as Intel Core Ultra and built on Intel 4, began shipping to customers in Q3 with an official launch set for December 14 (Intel Form 10-Q, filed October 27, 2023; Form 8-K, October 26, 2023, Exhibit 99.1).
Mar 2024
Regulatory
The US Commerce Department and Intel announced on March 20, 2024 a non-binding preliminary memorandum of terms for up to $8.5B in direct CHIPS Act funding for projects in Arizona, New Mexico, Ohio and Oregon, plus up to $11B in loans; Commerce said the award would help incentivize over $100B of Intel investment and create over 30,000 jobs (NIST CHIPS for America release, March 20, 2024).
Apr 2024
Paused
Intel's April 2, 2024 8-K recast its 2023 results under its internal foundry model: Intel Foundry had 2023 revenue of $18.9B, of which $18.0B was internal and $953M external, and an operating loss of $7.0B, up from $5.2B in 2022 (Intel Form 8-K, April 2, 2024, Exhibit 99.1).
Aug 2024
Paused
Intel announced on August 1, 2024, with its Q2 results, a cost plan that included a headcount reduction of more than 15% and suspension of the dividend starting in Q4 2024; Q2 GAAP net loss attributable to Intel was $1.6B, or $(0.38) a share (Intel Form 8-K, August 1, 2024, Exhibit 99.1).
Oct 2024
Milestone
Intel said with its Q2 results on August 1, 2024 that it had released the Intel 18A 1.0 process design kit and powered on its first client and server 18A products, Panther Lake and Clearwater Forest; with its Q3 results on October 31 it said 18A was healthy and progressing well and both lead products had met early 18A milestones ahead of 2025 launches (Intel Form 8-K, August 1 and October 31, 2024, Exhibit 99.1).
Oct 2024
Paused
Intel reported on October 31, 2024 a Q3 GAAP net loss attributable to Intel of $16.6B, or $(3.88) a share, which included $15.9B of impairment charges (a $9.9B non-cash valuation allowance against US deferred tax assets, $2.9B of goodwill impairment mostly at Mobileye, and $3.1B of non-cash impairments and accelerated depreciation of manufacturing assets, mostly the Intel 7 node) and $2.8B of restructuring charges; the dividend suspension was announced on August 1, effective in Q4 2024 (Intel Form 8-K, October 31, 2024, Exhibit 99.1).
Nov 2024
Regulatory
Intel and Commerce finalized the CHIPS award on November 26, 2024: up to $7.865B in direct funding (Intel's release states $7.86B), below the $8.5B in the March preliminary terms, for projects in Arizona, New Mexico, Ohio and Oregon, supporting an expected US investment of nearly $90B by the end of the decade within a plan of more than $100B (NIST CHIPS for America release, November 26, 2024). Intel's release says the funding is in addition to a $3B Secure Enclave contract for trusted manufacturing for the US government (Intel Form 8-K, November 27, 2024, Exhibit 99.1).
Dec 2024
Milestone
Intel announced on December 2, 2024 that CEO Pat Gelsinger had retired and stepped down from the board effective December 1; its 8-K records his resignation under a Retirement and Separation Agreement. The board named CFO David Zinsner and Michelle Johnston Holthaus, who also became CEO of the new Intel Products group, as interim co-CEOs and Frank Yeary interim executive chair, and Intel said Intel Foundry leadership was unchanged (Intel Form 8-K, filed December 3, 2024, and Exhibit 99.1, December 2, 2024).
Mar 2025
Milestone
Intel announced March 12 that Lip-Bu Tan would become CEO effective March 18, succeeding interim co-CEOs David Zinsner and Michelle Johnston Holthaus; Tan rejoined the board after stepping down in August 2024 (Intel 8-K, March 12, 2025).
Apr 2025
Milestone
Intel said at Foundry Direct Connect on April 29 that Intel 18A was in risk production, with volume manufacturing expected in 2025 (Oregon first, Arizona ramping later in the year) and Fab 52 in Arizona having run its first lot; Intel's Q4 2024 results (January 30, 2025) named Panther Lake as the lead 18A product (Intel newsroom, April 29, 2025). Intel's Q3 2025 results later reported Fab 52 fully operational.
Apr 2025
Milestone
Intel announced on April 14, 2025 a definitive agreement to sell 51% of its Altera business to Silver Lake in a transaction valuing Altera at $8.75B, with Intel keeping the other 49%; the sale closed on September 12, 2025, when Silver Lake acquired 51% of Altera for an equity value of about $3.3B (Intel Form 8-K, April 14, 2025, Exhibit 99.1, and Form 8-K filed September 15, 2025).
Aug 2025
Regulatory
Intel announced August 22 that the US government would invest $8.9B in Intel common stock, buying 433.3M primary shares at $20.47 (a 9.9% stake), funded by $5.7B of unpaid CHIPS Act grants and $3.2B from the Secure Enclave program, on top of $2.2B of CHIPS grants already received; the government also gets a five-year warrant at $20 per share for 5% more, exercisable only if Intel ceases to own at least 51% of the foundry business. The deal closed August 27 (Intel press release, August 22, 2025; 8-K, August 29, 2025).
Jun 2026
Launch
Intel launched Xeon 6+ (Clearwater Forest) in Q2 2026, its first server-class product on Intel 18A, with up to 288 E-cores; Intel's Q2 2026 results list the launch and its product page shows a Q2'26 launch date (Intel Q2 2026 earnings release, July 23, 2026; Intel Xeon 6+ product page).
Jul 2026
Milestone
Intel said on its July 23 Q2 call that it remains on track for 14A risk production for internal products in the second half of 2027 and decided in Q2 to fully commit to high-volume ramps in 2028, with 14A PDK 0.5 complete and PDK 0.9 due in October; its January 2026 10-K says Intel may pause or discontinue 14A if it cannot secure a significant external customer (Intel Q2 2026 earnings call comments, July 23, 2026; 10-K, January 23, 2026).