Register for a premium account to gain access to Sterling AI.
Get StartedThings you can ask Sterling:
PWR-20 microreactor developer with aggressive 80+ MoU pipeline. Deployment claims disputed by independent assessors
MoU Pipeline
80+ Memoranda of Understanding
Mostly Eastern Europe + UK + Texas; conversion to firm contracts pending regulatory clarity
PWR-20 Output
20 MWe per unit
Intentionally small; targets industrial co-location vs grid-scale utility deployment
Capital Raised
~$40M
Smallest SMR developer by funding (orders of magnitude below NuScale, TerraPower, X-energy)
Deployment Credibility
Disputed
Independent assessors (MIT, IAEA, industry analysts) question 2025-2027 deployment timeline given NRC + EU regulatory realities
Total raised: ~$40M+ · Latest valuation: Undisclosed
| Round | Date | Amount | Valuation | Key Investors |
|---|---|---|---|---|
| Seed | 2020 | Undisclosed | — | Bret Kugelmass (founder, ex-Energy Impact Center) |
| Series A | Oct 2022 | $24M | — | Gigascale Capital (lead)MCJ CollectiveValor Equity PartnersMaC Venture Capital |
| Series A Extension | 2024 | ~$15M (reported) | — | Existing investor syndicate |
| System | Type | Status |
|---|---|---|
| PWR-20 | 20 MWe small pressurized water reactor (intentionally small, factory-built, modular) | Design + initial manufacturing; first commercial site pending regulatory approval |
| Modular Deployment Model | Container-shipped reactor + power-block units; 24-month site-to-energy claim | Aspirational. No commercial unit operating |
Bridgend Wales site lease for first European deployment; UK / Wales regulatory engagement underway.
Multiple letters of intent with Polish industrial companies; targets coal-replacement and industrial heat.
Texas-sited MoUs for data-center and oil-gas industrial customers; Texas regulatory environment more permissive than federal NRC.
Climate-focused VC; lead Series A investor.
Earlier-stage backer; energy-tech thesis.
Bret Kugelmass (also founded the Energy Impact Center think tank) launches Last Energy in Washington, DC
20 MWe small pressurized water reactor concept; intentionally small + factory-built + modular
Gigascale Capital leads; first significant institutional round
Site rights secured at Bridgend Wales for first European deployment
80+ Memoranda of Understanding signed across Eastern Europe + UK + Texas; mostly with industrial customers + data-center developers
MIT + IAEA + nuclear-industry analysts publicly question whether Last Energy's 2025-2027 deployment claims are achievable given NRC + EU regulatory timelines
Initial PWR-20 module manufacturing begins; deployment at Wales site targeted but regulatory path not yet secured