KPI data tables
Rocket Lab operating metrics behind the KPI charts, newest period first (up to 24 periods per chart). Periods use each company's own fiscal labels where the source does; each table names its source.
| Period | Total Backlog (USD B) |
|---|---|
| Sep 2026 | 3.57 |
| Jun 2026 | 2.36 |
| Mar 2026 | 2.2 |
| Dec 2025 | 1.85 |
| Dec 2024 | 1.07 |
| Dec 2023 | 1.046 |
| Dec 2022 | 0.504 |
Source: Rocket Lab Form 10-K backlog disclosures: $503.6M (Dec 31, 2022; FY2022 10-K filed Mar 7, 2023), $1,046.1M (Dec 31, 2023; FY2023 10-K filed Feb 28, 2024) and $1,067.0M (Dec 31, 2024; FY2024 10-K filed Feb 27, 2025). $1.85B (Dec 31, 2025, up 73% YoY) per the Q4/FY2025 earnings release, Exhibit 99.1 to the Form 8-K filed Feb 26, 2026 (https://www.sec.gov/Archives/edgar/data/1819994/000181999426000012/rklb-02262026ex991.htm). $2.2B (Mar 31, 2026, up 20.2% QoQ; $2,219.8M in the Q1 2026 Form 10-Q, +108% vs $1,066.9M at Mar 31, 2025) and the Q1 2026 launch-contract count per Exhibit 99.1 to the Form 8-K filed May 7, 2026 (https://www.sec.gov/Archives/edgar/data/1819994/000181999426000027/rklb-05072026ex991.htm). $2.36B (Jun 30, 2026; $2,355.9M, of which space systems $1,415.8M and launch services $940.2M) in the Q2 2026 Form 10-Q (https://www.sec.gov/Archives/edgar/data/1819994/000181999426000062/rklb-20260630.htm). $3.57B (Sep 30, 2026; $3,573.0M, space systems $1,724.7M and launch services $1,848.3M) in the Q3 2026 Form 10-Q filed Nov 9, 2026 (https://www.sec.gov/Archives/edgar/data/1819994/000181999426000074/rklb-20260930.htm).
| Period | Successful orbital launches | Failures (did not reach orbit) |
|---|---|---|
| 2025 | 21 | 0 |
| 2024 | 16 | 0 |
| 2023 | 9 | 1 |
| 2022 | 9 | 0 |
| 2021 | 5 | 1 |
| 2020 | 6 | 1 |
| 2019 | 6 | 0 |
| 2018 | 3 | 0 |
| 2017 | 0 | 1 |
Source: Rocket Lab Forms 10-K: vehicles launched in 2020 (seven) and 2021 (six) per the FY2021 10-K (filed Mar 24, 2022); nine in 2022 per the FY2022 10-K (Mar 7, 2023); ten in 2023 per the FY2023 10-K (Feb 28, 2024); 16 in 2024 per the FY2024 10-K (Feb 27, 2025); 21 in 2025 per the FY2025 10-K (Feb 26, 2026). Cumulative successful Electron launches per the 10-Ks (20 at Dec 31, 2021; 29 in 2022; 38 in 2023; 54 in 2024; 75 in 2025) fix each year's successes, and failures are launches less successes. The Q4 2025 earnings release (Exhibit 99.1 to the Form 8-K filed Feb 26, 2026, https://www.sec.gov/Archives/edgar/data/1819994/000181999426000012/rklb-02262026ex991.htm) states 21 missions across Electron and HASTE in 2025 with a 100% success rate, three of them HASTE. The 2017 to 2019 split (2017 maiden flight a failure, 3 successes in 2018, 6 in 2019) is the remainder of the 10-K cumulative of 20 successes through 2021 after 2020 (6) and 2021 (5); the per-year split within 2017 to 2019 is not printed in the 10-Ks.
| Period | Space Systems (spacecraft, components, Photon) | Launch Services (Electron, HASTE, Neutron) |
|---|---|---|
| 2025 | 402.8 | 199 |
| 2024 | 310.8 | 125.4 |
| 2023 | 172.7 | 71.9 |
| 2022 | 150.3 | 60.7 |
Source: Rocket Lab Forms 10-K (FY2023 10-K: Launch services $71.9M and Space systems $172.7M for 2023, with 2022 comparatives Launch $60.7M / Space $150.3M; FY2025 10-K: Launch services $199.0M and Space systems $402.8M for 2025, total $601.8M; FY2024 figures Launch $125.4M / Space $310.8M, total $436.2M per FY2024 results). Segment lines are Rocket Lab's own disaggregated revenue reporting.