Partial operating KPIs
This page has 3 company-specific operating KPI charts. A sourced floor is 4. Sector membership does not count.
X-energy Cumulative Private Equity plus IPO Proceeds
X-energy: Funding Rounds + Capital Stack
| Round | Date | Amount | Lead Investors | Notes |
|---|---|---|---|---|
| DOE ARDP Phase 1 award | Oct 2020 | $80M (initial) | DOE Office of Nuclear Energy | Selected alongside TerraPower as one of two ARDP demonstration awardees; X-energy says its award was initially $1.2B with 50/50 cost share |
| Convertible notes (Series C-1 and C-2) | 2022-2023 | $57.4M C-1 notes (2022) and $113.0M C-2 notes (2022 and 2023) | Investors not named in the prospectus; $70.0M of the C-2 notes went to related parties | Converted into Series C preferred units in Dec 2023, Mar 2024, Oct 2024 and Sep 2025 |
| Series A-1 and Series C preferred units | 2023 | $50.0M cash investment | Investors not named in the prospectus | Series A-1 units issued with Series C units and Series B-2 common units |
| Series C-1 (Amazon anchor) | Oct 2024 | About $500M announced; $626.5M gross cash proceeds in 2024 (prospectus) | Amazon's Climate Pledge Fund (anchor), Citadel's Ken Griffin, Ares Management affiliates, NGP, University of Michigan | Amazon and X-energy aim to bring more than 5 GW online in the US by 2039, starting with a 320 MW project with Energy Northwest (X-energy, Oct 16 2024) |
| Series C-1 additional closing | Jan 24 2025 | $53.4M | Various investors | 8,235,521 Series C-1 preferred units issued |
| Series D | Nov 21 2025 | About $700.0M gross cash proceeds | Investors not named in the prospectus | 48,154,955 Series D preferred units issued |
| Nasdaq IPO (ticker XE) | Apr 2026 | $1.018B gross before the underwriters' option (44,254,659 shares at $23.00); about $1.1B net at closing | Public markets | Priced Apr 23 2026; trading began Apr 24 and the IPO closed Apr 27 |
| Total preferred units sold, Oct 2024 to Nov 2025 | Oct 2024 to Nov 2025 | $1.38B ($626.5M + $53.4M + $700.0M) | Sum of the three amounts the prospectus prints | Earlier rounds are not sized in the prospectus; DOE had reimbursed X-energy over $438M under ARDP as of Dec 31 2025 |
| Cash and cash equivalents | Dec 31 2025 | $458.9M actual; $1.409B pro forma for the IPO | n/a | First commercial operation of the Dow Seadrift project expected in the early 2030s (prospectus) |
| Editorial. Why this matters | X-energy's prospectus shows $1.38B of preferred units sold from Oct 2024 to Nov 2025, then a $1.018B IPO, on top of a DOE award that was initially $1.2B. The Amazon Series C-1 of Oct 2024 was the anchor deal. Marquee question: does that capital carry X-energy through commercial operation of the Dow Seadrift project, which it expects in the early 2030s, or does another mega-round close first? |
X-energy: Xe-100 HTGR Customer Pipeline (Project-by-Project Status)
| Customer | Location | Status | Units / MWe | Target COD |
|---|---|---|---|---|
| Amazon + Energy Northwest (central WA) | Energy Northwest site adjacent to Columbia Generating Station, Richland WA | First Amazon-backed deployment; Amazon holds options for more than 5 GWe of Xe-100 projects across the US by 2039 | Initial 4 reactors / ~320 MWe, upsizable to ~960 MWe | Early 2030s (first commercial delivery) |
| Dow Chemical (Seadrift TX) | Dow Seadrift petrochemical complex | Construction permit application accepted by NRC May 2025; Environmental Assessment + FONSI completed May 2026; permit expected Q1 2027 | 4 modules / ~320 MWe (process heat + electricity) | Early 2030s |
| Energy Northwest (additional sites) | Pacific Northwest (multiple potential sites beyond the Columbia site) | Pre-application engagement | TBD | Beyond 2032 |
| Cavendish + UK government (UK) | UK site selection ongoing | UK pre-licensing engagement | TBD | Beyond 2032 |
| Other US industrial sites (Dow + adjacent) | Multiple petrochemical + industrial counterparty discussions | MoU + early engineering | Various module counts | Beyond 2030 |
| TRISO-X fuel facility (Oak Ridge TN) | Oak Ridge TN; DOE-funded construction | Received a 40 year NRC special nuclear material license on Feb 13 2026, the first Category II fuel fabrication license the NRC has issued (DOE); construction continuing | 8 metric tons HALEU/yr target capacity | TRISO-X facility COD 2027-2028 |
| Editorial. Why this matters | X-energy is structurally unique among advanced reactor developers: it sells the reactor + the fuel (TRISO-X) as an integrated product, like a vertically-integrated SaaS bundle. Amazon's Series C-1 investment and the Energy Northwest project (Oct 2024) anchor the more than 5 GWe US deployment target that X-energy calls the largest commercial deployment target of SMRs to date. Marquee question: does X-energy convert Amazon + Energy Northwest + Dow + UK customer interest into a FOAK COD by 2030, or does the schedule slip into 2031-2033? |

X-energy in Nuclear
KPI data tables
X-energy operating metrics behind the KPI charts, newest period first (up to 24 periods per chart). Periods use each company's own fiscal labels where the source does; each table names its source.
| Period | Cumulative equity + IPO ($M) |
|---|---|
| 2026-04 IPO (gross) | 2,447.9 |
| 2025-11 Series D | 1,429.9 |
| 2025-01 Series C-1 closing | 729.9 |
| 2024-10 Series C-1 | 676.5 |
| 2023 Series A-1 + C cash | 50 |
Source: src/data/kpis/x-energy/funding-rounds-table.json