Orbital Data Center Technology

Space DC Platform Comparison

Technical specifications for all announced and operational orbital data center platforms: Starcloud, Axiom, K2 Space, Google Suncatcher, OrbitsEdge, Lonestar, HPE SBC, Aethero, and ASCEND.

Spaceborne Computer-2 · HPE
Launch:
v1: Aug 2017 (207 days without reset, per NASA); v2: Feb 20, 2021
Status:
Operational on ISS (ongoing)
Confidence:
High
Orbit:
ISS orbit (408 km)
Solar power:
ISS power
Compute:
HPE Edgeline / ProLiant edge server (software-hardened COTS)
Storage:
Not confirmed in a primary source
Comms:
ISS communications
Not disclosed:
Mass

HPE, ISS National Lab, NASA (Feb 20, 2021)

Deimos · Aethero
Launch:
Aug 2024
Status:
Operational in orbit
Confidence:
High
Orbit:
LEO
Solar power:
Solar (not specified)
Compute:
NVIDIA Jetson Orin SoC in the NxN-ECM (first space-rated edge computer to achieve 100 TOPS, per Aethero)
Comms:
Weak transmitter; limited bandwidth; low-capacity battery
Not disclosed:
Mass, Storage

Aethero release (Aug 16, 2024), Aethero platforms page

Freedom · Lonestar Data
Launch:
IM-2 lander (launched Feb 2025; landing early Mar 2025)
Status:
Launched (corrected from IM-1 to IM-2)
Confidence:
High
Orbit:
Lunar surface (via IM-2 Athena lander, not IM-1)
Solar power:
Solar (lander power system)
Compute:
Microchip PolarFire FPGA + RISC-V processor (not GPU-class)
Storage:
8 TB Phison Pascari enterprise SSD (confirmed)
Comms:
Ground relay via lander
Not disclosed:
Mass

Lonestar releases (Feb 10 and Mar 5, 2025), Phison Blog

DCU-1 (AxDCU-1) · Axiom Space
Launch:
Spring 2025 (target); no launch confirmation found
Status:
Integration / delayed
Confidence:
Low-Medium
Orbit:
ISS orbit (408 km)
Solar power:
ISS power allocation
Compute:
Red Hat Device Edge (MicroShift/RHEL/Ansible): underlying hardware not specified
Comms:
ISS communications
Not disclosed:
Mass, Storage

Red Hat Press, Axiom Space

Space DC Satellite · NTT + SKY Perfect JSAT
Launch:
Commercial satellite services planned from around 2025; no launch date disclosed
Status:
Development; no launch date disclosed
Confidence:
Low-Medium
Orbit:
Multi-orbit: HAPS + LEO + GEO
Solar power:
Solar (not specified)
Compute:
Photonics-electronics convergence technology for low power and cosmic ray resistance
Comms:
Optical wireless links between orbits and to the ground
Not disclosed:
Mass, Storage

NTT release (May 20, 2021)

Starcloud-1 (Lumen 1) · Starcloud
Launch:
Nov 2025
Status:
In orbit; trained nanoGPT in Dec 2025
Confidence:
High
Mass:
60 kg
Orbit:
LEO
Compute:
NVIDIA H100 (variant not disclosed)
Not disclosed:
Solar power, Storage, Comms

Starcloud (Starcloud-1 page), NVIDIA blog (Oct 15, 2025)

Space Compute Hardware

All known compute hardware deployed or planned for orbital data centers: GPUs, TPUs, FPGAs, edge processors, and radiation shielding approaches.

Chip / ModuleVendorTypePerformanceRad TolerancePower (W)Deployed ByStatus
H100 SXM
NVIDIA H100 page, Starcloud-1 page
NVIDIAGPU80 GB, 3.35 TB/s BW, 3,958 TFLOPS FP8 (with sparsity)COTS; no radiation rating published700Starcloud-1In orbit (Nov 2025)
Blackwell B200
NVIDIA blog (Oct 15, 2025), NVIDIA DGX B200 page, NVIDIA DGX B200 user guide
NVIDIAGPU3X training and 15X inference vs DGX H100 (NVIDIA DGX B200 page, projected)COTS; no radiation rating published1,000Starcloud (looking to integrate, per NVIDIA)Future Starcloud launches; no date given
Vera Rubin Space-1 Module
NVIDIA Newsroom (Mar 16, 2026)
NVIDIAGPU ModuleUp to 25x the AI compute of H100 for space-based inferencingNot disclosedNot disclosedAxiom Space, Starcloud, Planet LabsUnveiled at GTC Mar 2026; availability at a later date
Trillium TPU v6e
Google Research blog (Nov 4, 2025), Google blog (Oct 1 and Oct 30, 2026)
GoogleTPUGoogle v6e Cloud TPU (AI accelerator)HBM irregularities from 2 krad(Si); no hard TID failures up to 15 krad(Si) testedNot disclosedProject SuncatcherPrototype satellite in orbit since Oct 1, 2026; twin satellites planned for 2027
Jetson Orin NX
NVIDIA Jetson Orin page, Aethero NxN-ECM page, Aethero platforms page
NVIDIAEdge GPUUp to 157 TOPS in Super ModeCOTS module; Aethero NxN-ECM rated 50+ krad TID by system design10-40Aethero NxN-ECM (Phobos)In orbit (Phobos, Mar 2026)
NxA-ECM
Aethero NxA-ECM page
AetheroEdge ModuleNVIDIA Thor or Orin; 4,000+ TFLOPS per Thor module50+ krad TID, rad-hard by system designNot disclosedAethero next-genTRL-8
PIC64-HPSC
Microchip, RISC-V Intl
MicrochipProcessor8x RISC-V X280 @ 1 GHz, 2 TOPS int8, 1 TFLOPS bf16Space-qualified (TBD krad)TBDAxiom ODC Node, NASAIn production
Versal XQR ACAP
AMD DS946, AMD Versal XQR product brief
AMD/XilinxFPGA+AI400 AI engines, 1,968 DSP engines (XQRVC1902)100 krad(Si) TID typical (120 max), SEL immunity 80 MeV-cm2/mg; AMD class B flowNot disclosedMilitary/aerospaceIn production (AMD class B flow)
Kintex UltraScale XQR
AMD DS882, AMD Kintex UltraScale XQR page
AMD/XilinxFPGAHigh-performance reconfigurable100 krad(Si) TID typical (GEO), SEL immunity 80 MeV-cm2/mg (20 nm)Not disclosedVarious defenseOffered in AMD class B and class Y flows
RH12 (12nm FinFET)
BAE Systems release (Nov 19, 2025), GlobalFoundries release (Nov 19, 2025)
BAE / GlobalFoundriesCustom ASICRad-hard 12 nm ASIC and SoC design Storefront on GlobalFoundries 12LP FinFETRadiation-hardened by design; no TID figure printedNot disclosedMilitary/intelligenceInitial development kit released to alpha users; IP completing qualification (Nov 19, 2025)
GR765 (NOEL-V)
Frontgrade Gaisler GR765 page, Frontgrade release (Apr 20, 2021)
FrontgradeProcessor8 NOEL-V RV64GCH or 8 LEON5FT SPARC V8 cores, up to 800 MHz, 2,600 DMIPS/core, 32k-LUT eFPGA50 krad(Si) TID guaranteed by platform (100 krad(Si) testing to be performed), SEL ≥60 MeV-cm2/mg at 125 CNot disclosedESA-funded developmentIn development
VA4 MCU
VORAGO VA4 family, VA41620 and VA41630 pages
VORAGOMCUArm Cortex-M4, 100 MHz (VA41630)TID >300 krad(Si) (VA41620; >200 with FRAM on VA41630), SEL immunity >110 MeV-cm2/mg at 125 CNot disclosedLEO missionsProduction qualified and shipping now
SAMD21RT
Microchip
MicrochipMCUARM Cortex-M0+ (rad-tolerant)Radiation-tolerantLowCubeSats, small satsIn production
ZSOM-F01
ZES release (Feb 26, 2025), ZES ZSOM-F01 page
Zero Error SystemsSoMAMD Zynq UltraScale+ XCZU3EG: 4x Cortex-A53 1.2 GHz, 2x Cortex-R5 500 MHz, 4 GB PS and 1 GB PL DDR4COTS FPGA with SEL (ZES100 LDAP-IC) and SEU (TMR voter, EDAC) mitigation; no TID figure printed24 (12 V, 2 A max)VariousReleased Feb 26, 2025; customer testing from early Apr 2025
Edgeline EL4000
HPE, ISS National Lab, NASA (Feb 20, 2021)
HPEEdge ServerCommercial edge server (software-hardened)Software-hardened COTSVariesHPE SBC-1 & SBC-2 on ISSFlight heritage (207 days without reset, per NASA)

Orbit Type Comparison

LEO vs MEO vs GEO vs Lagrange points: latency, solar illumination, radiation, debris risk, launch cost, and best use cases for each orbit type.

ParameterLEO200 - 2,000 kmMEO2,000 - 35,786 kmGEO35,786 kmLagrangeL1 - L5 points
One-way Latency1-10 ms30-60 ms240-300 ms>300 ms (1.3s for L2)
Round-trip Latency2-20 ms60-120 ms480-600 ms>600 ms
Solar Illumination60-75% (eclipsed 25-40%)80-95%~99% (short eclipse seasons)~100% (near-constant)
Radiation EnvironmentLower (magnetosphere protection)Van Allen belt: ~100x LEO doseHigh: 100-1,000x LEO doseMinimal (solar wind only)
Debris RiskCRITICALLow-moderateVery lowNegligible
Tracked Debris Objects~47,280 total (Nov 2, 2026)~Few hundred<100 significant~0
Launch Cost (relative)Baseline ($2,940/kg Falcon 9)2-3x LEO cost3-4x LEO cost4-5x LEO cost
Orbital Period90-120 minutes2-12 hours24 hours (stationary)Varies (halo orbits)
Ground Contact per Pass5-15 minutesHoursContinuous (fixed position)Near-continuous
Atmospheric DragSignificant below 500 kmNegligiblen/dn/d
Best Use CaseLow-latency compute, EO processing, broadbandNavigation, regional comms, defenseBroadcast, fixed comms, weatherDeep space relay, astronomy
Key DC PlayersStarcloud, Axiom, OrbitsEdge, Aethero, Google SuncatcherK2 Space (GRAVITAS), SESLegacy telecom (Intelsat, Viasat)NASA JWST, ESA missions
Deorbit Requirement5 years (FCC rule, effective Sep 2024)25+ years (varies)Graveyard orbit (+300 km)n/d

Radiation Hardening Approaches

Three paradigms for protecting computing hardware in orbit: traditional rad-hard, software-hardened COTS, and shielded COTS (Cosmic Shielding Plasteel).

Approach
TraditionalRadiation-hard-by-design ICs using specialized fabrication
Software-HardenedCOTS hardware + adaptive software that manages radiation events
ShieldedCOTS hardware + nanocomposite material shielding (Plasteel)
Cost Premium vs COTS
Traditional5-10x higher (industry estimate)
Software-Hardened~1x (standard COTS hardware cost)
ShieldedNear cost parity with aluminum; 15x cost savings vs traditional rad-hard
Performance vs COTS
Traditional1-3 generations behind (significant penalty)
Software-HardenedFull COTS performance (throttled during radiation events only)
ShieldedFull COTS performance (constant)
Radiation Tolerance (TID)
Traditional100-300+ krad(Si) by design
Software-HardenedVaries by component; software compensates
Shielded60% reduction in radiation exposure vs aluminum
SEE (Single Event Effect) Protection
TraditionalBuilt into silicon design
Software-HardenedSoftware detection and recovery
ShieldedLimits single event effects (Aethero release, Jul 8, 2024)
Mission Lifetime Extension
TraditionalDesigned for 5-15 year missions
Software-Hardened207 days without reset demonstrated on ISS (HPE SBC-1, per NASA)
Shielded8x lifespan vs conventional materials
Mass Impact
TraditionalStandard IC weight
Software-HardenedStandard + some redundancy
ShieldedUp to 60% less mass than aluminum shielding for equivalent protection (Cosmic Shielding)
Lead Time
Traditional12-18 months typical
Software-HardenedStandard procurement
Shielded~2 weeks (Cosmic Shielding claim)
Flight Heritage
TraditionalDecades (Apollo era onward)
Software-Hardened207 days without reset on ISS (9/20 SSDs failed)
ShieldedTested on Space Forge satellite; Aethero Deimos in orbit
Key Suppliers
TraditionalBAE Systems (RH12), Microchip (SAMD21RT), Frontgrade (GR765), VORAGO (VA4)
Software-HardenedHPE (Edgeline EL4000), general Linux-based approaches
ShieldedCosmic Shielding Corp (exclusive Plasteel manufacturer)
Government Support
TraditionalLong DOD/NASA heritage programs
Software-HardenedNASA ISS programs
Shielded$2.0M US Air Force TACFI contract (Aug 2025)
Best For
TraditionalCritical military/deep space missions requiring absolute reliability
Software-HardenedCost-sensitive LEO missions with ISS-like radiation environment
ShieldedCommercial LEO constellations needing COTS performance + protection

Ask Sterling

Register for a premium account to gain access to Sterling AI.

Get Started

Things you can ask Sterling:

Summarize Tesla's latest earnings reportWhy did NVIDIA's margins expand?Compare Apple vs Microsoft's cash flowWhat's driving EV industry growth?
Menu
Favorites
Orbital Data Center Technology: Market Data | Sterling