Partial operating KPIs
This page has 3 company-specific operating KPI charts. A sourced floor is 4. Sector membership does not count.
CFS SPARC HTS Toroidal Field Achieved
Field (Tesla)
Commonwealth Fusion Systems: HTS Magnet Performance Milestones
| Milestone | Date | Field Strength Achieved | Significance |
|---|---|---|---|
| SPARC TFMC demonstration (industry-first commercial HTS tokamak magnet) | 2021-09 | 20 Tesla at 20 K | Nature paper Sep 2021; validated REBCO architecture at commercial scale; opened HTS-tokamak path |
| MIT PSFC + CFS HTS tape supply chain build-out | 2022-Q2 to 2023-Q4 | N/A (manufacturing capacity scaling) | Established stable REBCO tape supply via Faraday Factory + Fujikura + AMSC + others |
| SPARC TF Coil #1 manufactured + factory-tested | 2023-Q3 | Confirmed 20+ T performance at full coil scale | First production TF coil at full SPARC scale (~10 m tall) |
| SPARC TF Coil #2-6 manufactured + tested | 2023-Q4 to 2024-Q4 | Confirmed performance per design | Scaling magnet production cadence through factory |
| SPARC TF Coil #7-12 production | 2025-Q2 to 2025-Q4 | Performance per design | Continued production cadence |
| First production D-shaped TF coils validated (DOE review) | 2025-09 | Met design specifications per DOE review board | Month-long test campaign; DOE national-lab magnet specialists confirmed the data, triggering an $8M Milestone-Based Fusion Development Program payment, the largest first-phase award of the eight participating companies |
| TF1 installed in SPARC tokamak hall (Devens MA) | 2025-2026 | Complete | First of 18 toroidal field magnets installed; most tangible hardware milestone on the path to first plasma |
| SPARC TF Coil set complete (all 18 coils) | Target 2026-Q1 | Performance per design | Required for SPARC mechanical complete + first plasma |
| Central solenoid + poloidal field coils complete | Target 2026-Q3 | Performance per design | Final magnet subsystems before SPARC first plasma |
| ARC commercial magnet design freeze | Target 2028 | Higher field strength + duty cycle vs SPARC | ARC commercial scale-up; design improvements over SPARC magnets |
| ARC magnet production begins | Target 2029 | Performance per ARC design | Following SPARC operational validation |
| Editorial. Why this matters | HTS magnets are the structural enabler of compact + commercial-scale fusion tokamaks. CFS's 2021 TFMC demonstration established the company-unique competitive lead. Marquee question: does CFS maintain its HTS magnet lead vs Tokamak Energy (the only comparable HTS tokamak developer) + emerging Chinese + European programs, or does the HTS supply chain mature enough that the lead narrows? |
Commonwealth Fusion Systems: SPARC Construction Progress at Devens MA
| Subsystem | Status | Milestone Date | Significance |
|---|---|---|---|
| Devens MA campus + tokamak hall | Operational | 2023-Q3 | Tokamak hall fully constructed; supporting facilities operational |
| HTS magnet manufacturing (Tokamak Field Magnet Coils) | TFMC SPARC demonstration successful 2021 | 2021-09 (TFMC 20 T at 20 K) | Industry-first commercial-scale HTS tokamak magnet; validated REBCO architecture |
| Central solenoid assembly | Manufacturing in progress at supplier | On track for 2025 delivery | REBCO-based; combined with TF coils provides plasma confinement |
| Vacuum vessel fabrication | Manufacturing in progress at supplier | On track for 2025-2026 delivery | First-wall + neutron shielding integrated |
| Toroidal Field (TF) coil set production | First 6 of 18 TF coils complete + tested | Production target complete 2026-Q1 | Each TF coil ~10 m tall + ~1.5 m wide; HTS REBCO tape |
| Plasma diagnostics + control systems | Design phase complete; supplier procurement in progress | Target operational 2026-Q3 | Real-time plasma control + diagnostics for Q > 1 demonstration |
| SPARC first plasma (mechanical complete) | Target 2026-Q4 to 2027-Q1 | On schedule (revised from original 2025 target) | Original Series B 2021 target was 2025; current target 2026 to 2027 H1 |
| SPARC Q > 1 net energy gain demonstration | Target 2027 (revised from 2026) | On schedule per current commercial roadmap | The scientific milestone; required for ARC commercial commitments |
| ARC commercial design freeze (Virginia) | Target 2028 | Design work in progress alongside SPARC operations | Google ARC Virginia PPA (Jun 2025; 200 MW) anchored on this milestone |
| ARC FOAK commercial operation (Virginia) | Target 2030 | On schedule per Series B + Series B2 roadmaps | Marquee commercial-fusion target; on schedule vs original announcement |
| Editorial. Why this matters | CFS + SPARC is the most aggressive credible commercial-fusion timeline + the only fusion developer with a binding commercial PPA tied to demonstration timelines (Google + ARC, Jun 2025). HTS magnet technology is the company-unique enabler. Marquee question: does SPARC achieve Q > 1 on schedule (2027) + does that validate the broader HTS-tokamak path that ARC depends on? |

Commonwealth Fusion Systems in Nuclear
KPI data tables
Commonwealth Fusion Systems operating metrics behind the KPI charts, newest period first (up to 24 periods per chart). Periods use each company's own fiscal labels where the source does; each table names its source.
| Period | Field (Tesla) |
|---|---|
| 2023-Q3 TF coil 1 | 20 |
| 2021-09 TFMC | 20 |
Source: src/data/kpis/commonwealth-fusion-systems/hts-magnet-performance-milestones.json