Kairos Power logoKairos Power

UC Berkeley spinout developing the KP-FHR fluoride-salt-cooled high-temperature reactor; Google's commercial advanced-reactor partner

Alameda, CA~600Founded 2016Private round sizes not disclosed; DOE share $303M of a $629M ARDP award raisedPrivate (no recent disclosed valuation) valuationkairospower.com
IndustriesNuclear

Market Metrics

Google Master Agreement

500 MW by 2035

Oct 2024 Master Plant Development Agreement; first deployment by 2030

Hermes NRC Construction Permit

First non-water-cooled CP in 50+ years

Dec 2023; Kairos Power says Hermes is the first non-water-cooled reactor approved for construction in the US in over 50 years

KP-FHR Output

150 MWe per plant (2 x 75 MWe)

FLiBe-cooled, TRISO-fuel pebble-bed; 650 C outlet enables industrial heat applications

DOE ARDP Cost-share

$303M DOE share

Of a $629M total award value over seven years for Hermes (Dec 2020)

Funding History

Total raised: Private round sizes not disclosed; DOE share $303M of a $629M ARDP award · Latest valuation: Private (no recent disclosed valuation)

RoundDateAmountValuationKey Investors
Founder + Early2016-2020Undisclosed-
Mike Laufer / Edward Blandford (co-founders)
DOE ARDP Risk-ReductionDec 2020$303M DOE share of a $629M total award value-
US Department of Energy (Advanced Reactor Demonstration Program)
Strategic investmentSep 2026Up to $100M through direct investment and in-kind engineering services (binding term sheet, subject to regulatory approvals)-
Samsung C&T Engineering & Construction Group

Product Specifications

SystemTypeStatus
KP-FHRFluoride-salt-cooled high-temperature reactor (two 75 MWe reactors per 150 MWe plant, TRISO fuel pebbles)Design certification work; first commercial ~2030
Hermes35 MWth non-electricity demonstration reactor (Oak Ridge, TN)Under construction; commissioning ~2027
Hermes 2Electricity-producing demonstration plant (up to 50 MW to the TVA grid)NRC construction permits issued Nov 21 2024; broke ground Apr 17 2026; operations scheduled for 2030
ETU (Engineering Test Unit)Non-nuclear FLiBe-salt integrated test loop (Albuquerque)Completed 1,000 hours of pumped salt operations (Jan 2024)
FLiBe Salt ProductionVertically integrated salt manufacturingSalt Production Facility groundbreaking Oct 2 2024 (Albuquerque, NM)

Partnerships & Investors

GoogleCustomer / Master Developer

Oct 2024 Master Plant Development Agreement for a fleet of advanced reactors totaling 500 MW by 2035, with the first deployment by 2030; Kairos Power calls it the first corporate agreement for multiple deployments of a single advanced reactor design in the US.

Tennessee Valley Authority (TVA)Strategic / Host

Host utility for Hermes + Hermes 2 at Oak Ridge; potential operator of future commercial KP-FHR fleet.

US Department of EnergyCost-share Sponsor

ARDP Risk-Reduction award for Hermes: total award value $629M over seven years, of which DOE's share is $303M.

Oak Ridge National LaboratoryResearch

Materials, fuel-cycle, and salt-chemistry research collaboration; FLiBe production lineage.

Materion + Materials Sciences CorpStrategic / Supply

FLiBe salt component supply chain; vertically integrated through Kairos's own production facility.

Westinghouse + Curtiss-WrightSupply Chain

Reactor pressure vessel + components for Hermes.

Key Milestones

2016

Company Founded

Mike Laufer (CEO) and Edward Blandford (CTO) are the co-founders of Kairos Power

Dec 2020

DOE ARDP Risk-Reduction Selection

DOE selects Kairos Power on Dec 16 2020 as one of five teams for ARDP Risk Reduction funding; the Hermes reduced-scale test reactor has a total award value of $629M over seven years, of which DOE's share is $303M

Dec 2023

Hermes NRC Construction Permit

NRC Commission directs the staff on Dec 12 2023 to issue a construction permit for the 35 MWt Hermes non-power test reactor in Oak Ridge TN, and permit CPTR-6 is issued Dec 14 2023; Kairos Power says it is the first non-water-cooled reactor approved for construction in the US in over 50 years

Jan 2024

ETU 1.0 Pumped Salt Operations

Completes 1,000 hours of pumped salt operations after loading 12 metric tons of Flibe into its non-nuclear Engineering Test Unit in Albuquerque NM, the largest Flibe system built

Jul 2024

Hermes Construction Start

Starts construction on the Hermes Low-Power Demonstration Reactor in Oak Ridge TN, with excavation beginning Jul 17 2024; targets operation in 2027

Oct 2024

Salt Production Facility Groundbreaking

Breaks ground Oct 2 2024 on a Salt Production Facility at its Manufacturing Development Campus in Albuquerque NM to make high-purity Flibe coolant enriched in lithium-7, starting with Hermes

Oct 2024

Google Master Plant Development Agreement

Signed Oct 14 2024 for a fleet of advanced reactors totaling 500 MW by 2035, with the first deployment by 2030; Kairos Power calls it the first corporate agreement for multiple deployments of a single advanced reactor design in the US

Nov 2024

Hermes 2 NRC Construction Permits

NRC Commission votes Nov 20 2024 to issue construction permits for the Hermes 2 plant at the Heritage Center Industrial Park in Oak Ridge TN, and the staff issues permits CPTR-7 and CPTR-8 on Nov 21 2024 for two reactors; Kairos Power says Hermes 2 is the first electricity-producing Gen IV plant approved for construction in the US

2030 (target)

First Google Plant at Hermes 2

Under a power purchase agreement between Kairos Power and TVA announced Aug 18 2025, Hermes 2 will deliver up to 50 MW to the TVA grid that powers Google data centers; operations are scheduled to begin in 2030, and Kairos Power says it is the first deployment under the Google agreement

Frequently asked questions

What does Kairos Power do?

Developer of the KP-FHR fluoride salt-cooled high-temperature reactor (commercial plant of two 75 MWe reactors, 150 MWe). Hermes demonstration construction permit granted December 2023 at Oak Ridge. Signed an October 2024 Master Plant Development Agreement with Google for a fleet of advanced reactors totaling 500 MW by 2035, with the first deployment by 2030. Kairos Power was founded in 2016, is headquartered in Alameda, CA and employs ~600.

How much funding has Kairos Power raised?

Kairos Power has raised Private round sizes not disclosed; DOE share $303M of a $629M ARDP award in total at a Private (no recent disclosed valuation) valuation, based on the funding rounds Sterling tracks.

Who are Kairos Power's main competitors?

Sterling groups Kairos Power in the Nuclear industry, alongside NuScale Power (SMR), Oklo (OKLO), NANO Nuclear Energy (NNE), TerraPower (private), X-energy (private) and Last Energy (private).

If I'm investing in Kairos Power, what similar companies should I consider?

If you are researching Kairos Power, also look at NuScale Power (SMR), Oklo (OKLO) and NANO Nuclear Energy (NNE). You can compare all of them side by side or browse the full Nuclear industry on Sterling.

Ask Sterling

Register for a premium account to gain access to Sterling AI.

Get Started

Things you can ask Sterling:

Summarize Tesla's latest earnings reportWhy did NVIDIA's margins expand?Compare Apple vs Microsoft's cash flowWhat's driving EV industry growth?
Menu
Favorites