AI Chip Foundries
Foundry Revenue by Company
Quarterly revenue at the top foundries: companies that manufacture chips designed by others. TSMC holds ~60% share and a near-monopoly on leading-edge AI nodes.
Process Node Status by Foundry
Leading-edge node availability and manufacturing status: TSMC vs Samsung vs Intel Foundry
- 7nm / N7
- Mass ProductionHVM: 2018, 11% of rev
- 5nm / N5
- Mass ProductionHVM: 2020, 33% of rev
- 4nm / N4
- Mass ProductionHVM: 2022
- 3nm / N3
- Mass ProductionHVM: 2022, 30% of rev
- 2nm / N2
- RampingHVM: 2025 Q4, 3% of rev
- 7nm / N7
- Mass ProductionHVM: 2019, 20% of rev
- 5nm / N5
- Mass ProductionHVM: 2021, 25% of rev
- 4nm / N4
- Mass ProductionHVM: 2022, 30% of rev
- 3nm / N3
- Mass ProductionHVM: 2024, 10% of rev
- 2nm / N2
- RampingHVM: 2025 Q4
- 7nm / N7
- Mass ProductionHVM: 2021 (Intel 4), 30% of rev
- 5nm / N5
- Mass ProductionHVM: 2024 (Intel 3), 15% of rev
- 4nm / N4
- CancelledHVM: Cancelled (Intel 20A)
- 3nm / N3
- RampingHVM: Late 2025 (Intel 18A)
- 2nm / N2
- In DevelopmentHVM: 2027 (Intel 14A)
| Foundry | 7nm / N7 | 5nm / N5 | 4nm / N4 | 3nm / N3 | 2nm / N2 |
|---|---|---|---|---|---|
Mass ProductionHVM: 201811% of rev | Mass ProductionHVM: 202033% of rev | Mass ProductionHVM: 2022 | Mass ProductionHVM: 202230% of rev | RampingHVM: 2025 Q43% of rev | |
Mass ProductionHVM: 201920% of rev | Mass ProductionHVM: 202125% of rev | Mass ProductionHVM: 202230% of rev | Mass ProductionHVM: 202410% of rev | RampingHVM: 2025 Q4 | |
Mass ProductionHVM: 2021 (Intel 4)30% of rev | Mass ProductionHVM: 2024 (Intel 3)15% of rev | CancelledHVM: Cancelled (Intel 20A) | RampingHVM: Late 2025 (Intel 18A) | In DevelopmentHVM: 2027 (Intel 14A) |
Global Fab Locations
Where the world's major fabs (chip-fabrication plants) actually sit on the map. Each fab is a $10–$30B asset; new builds in the US (Arizona, Ohio) and Japan are CHIPS Act–funded responses to Taiwan/Korea concentration risk.
TSMC
6 facilitiesHsinchu, Taiwan
HQ and primary R&D center: N2 volume production and A16 planned H2 2026
Tainan, Taiwan
Fab 18: world's first 3nm mass production facility, major 2nm expansion planned
Kaohsiung, Taiwan
2nm volume production began Q4 2025: NT$1.5T investment, 6 phases planned by end 2027
Phoenix, Arizona
Fab 1 (N4) operational Q4 2024. Total plan $265B (TSMC, July 2026): Fab 2 3nm volume production 2H 2027, Fab 3 N2/A16 by end of decade
Kumamoto, Japan
JASM joint venture: operational since Dec 2024. Phase 2 (3nm) under construction, expected online 2028
Dresden, Germany
ESMC joint venture: first process equipment installation 2H 2027
Samsung
4 facilitiesHwaseong, South Korea
Largest Samsung fab complex: 3nm GAA production, first High-NA EUV arrived March 2025
Pyeongtaek, South Korea
World's largest semiconductor campus: P4 converting to 1c DRAM
Taylor, Texas
Trial 2nm production reported Sept 2026, volume production 2027 (originally due 2024). Tesla as anchor customer via $16.5B long-term contract
Austin, Texas
Operational on mature nodes: contributing $19.8B to local economy
Intel
4 facilitiesHillsboro, Oregon
D1X: $36B investment, R&D hub, High-NA EUV assembly completed
Chandler, Arizona
Fab 52: 18A mass production beginning 2025, 15 EUV machines planned
Leixlip, Ireland
Fab 34: Intel 4 production since Sept 2023, Intel 3 shifting to HVM 2025
New Albany, Ohio
$28B fab complex: delayed to 2030-2031 (5-year delay from original plan)
SK Hynix
3 facilitiesIcheon, South Korea
HQ: 12-layer HBM mass production since Sept 2024, 130K units/month
Cheongju, South Korea
Existing fabs plus M15X: cleanroom opened Oct 2025, wafer input began Q1 2026, KRW 20T+ investment
West Lafayette, Indiana
$3.87B advanced packaging facility: foundations poured April 2026, ceremony Aug 27, 2026, operations 2H 2028
Micron
3 facilitiesBoise, Idaho
$15B new fab (ID1) under construction, wafer output mid-calendar 2027. $30B second fab (ID2): construction starts 2026, output late 2028
Hiroshima, Japan
1-gamma DRAM and EUV production. New HBM fab: JPY 1.5T (~$9.6B), HBM shipments ~2028
Clay, New York
Groundbreaking January 16, 2026: Fab 1 operations Q3 2030 (2-year delay). Up to $100B over 20+ years
Advanced Packaging Capacity (CoWoS-Equivalent Wafers per Month)
Quarterly advanced packaging capacity across TSMC CoWoS (dominant + AI accelerator supply bottleneck), Samsung I-Cube + X-Cube, Intel Foveros + EMIB, ASE + Amkor OSAT lines. Marquee read: does the industry total cross 150K wpm by EOY 2027?
TSMC Wafer Revenue Mix by Node
Share of TSMC wafer revenue by node from quarterly management reports. 2nm first printed at 3% in 2Q26. 7nm and below were 77% of wafer revenue that quarter.
TSMC Revenue Mix by Platform
TSMC net revenue by end-market platform. HPC (AI accelerators, CPU, GPU) reached 66% in 2Q26, up from 46% in 1Q24. Smartphone is still second but is no longer the growth engine.
TSMC Revenue Mix by Customer Geography
TSMC billed-to geography (customer headquarters, not wafer-start location). North America was 78% of net revenue in 2Q26. 4Q24 is omitted because the five-region split was not captured from that report.
Intel Products vs Intel Foundry
Intel Products (CCPG + DCAI) versus Intel Foundry segment revenue from the Q2 2026 10-Q. Foundry revenue is mostly intersegment sales to Products; external foundry customers were $293 million in Q2 2026. The lower panel is Foundry operating income, still a loss.
CHIPS Act Direct Funding Awards
NIST / Commerce direct-funding ceilings for the four largest AI-related manufacturing programs (TSMC Arizona, Intel, Samsung Texas, Micron). These are milestone-based grants (Intel's unpaid $5.7B became a 9.9% US government stake in Aug 2025), not the companies' total capex.
TSMC Arizona
- Direct funding (up to)
- $6.6B
- Stated private investment
- > $65B
- Sites
- Phoenix, AZ (three leading-edge fabs)
- What it funds
- Leading-edge logic cluster in Arizona; disbursed on construction and production milestones
Intel
- Direct funding (up to)
- $2.2B paid as grants (remaining $5.7B converted to a 9.9% U.S. stake, Aug 2025)
- Stated private investment
- Nearly $90B U.S. by end of decade
- Sites
- Arizona, New Mexico, Ohio, Oregon
- What it funds
- Leading-edge capacity expansion under Intel Foundry
Samsung Electronics
- Direct funding (up to)
- $4.745B
- Stated private investment
- > $37B
- Sites
- Taylor and Austin, TX
- What it funds
- Two leading-edge logic fabs and an R&D fab in Taylor, plus Austin expansion
Micron
- Direct funding (up to)
- $6.4B
- Stated private investment
- ~$100B NY and $25B ID over two decades (company vision)
- Sites
- Idaho, New York and Manassas, VA ($275M Manassas award finalized June 11, 2025)
- What it funds
- Advanced DRAM manufacturing; first step of a multi-decade U.S. memory build
| Recipient | Direct funding (up to) | Stated private investment | Sites | What it funds |
|---|---|---|---|---|
| TSMC Arizona | $6.6B | > $65B | Phoenix, AZ (three leading-edge fabs) | Leading-edge logic cluster in Arizona; disbursed on construction and production milestones |
| Intel | $2.2B paid as grants (remaining $5.7B converted to a 9.9% U.S. stake, Aug 2025) | Nearly $90B U.S. by end of decade | Arizona, New Mexico, Ohio, Oregon | Leading-edge capacity expansion under Intel Foundry |
| Samsung Electronics | $4.745B | > $37B | Taylor and Austin, TX | Two leading-edge logic fabs and an R&D fab in Taylor, plus Austin expansion |
| Micron | $6.4B | ~$100B NY and $25B ID over two decades (company vision) | Idaho, New York and Manassas, VA ($275M Manassas award finalized June 11, 2025) | Advanced DRAM manufacturing; first step of a multi-decade U.S. memory build |