Hydrogen Electrolyzers

Global Installed Electrolyzer Capacity

Machines in the ground, not hydrogen produced. China is 65% of the installed base. Utilization is mostly undisclosed.

China vs Rest of World (Installed plus FID)

IEA: China is 65% of global installed electrolyzer capacity plus capacity that has reached FID. Not 65% of the 3 GW installed base alone.

Factory Nameplate vs Machines at FID

38 GW/yr of factories in 2024, announced toward 186 GW/yr by 2030. Only 26 GW of machines are under construction or at FID.

Who makes electrolyzers

Announced manufacturing ran ahead of FID. IEA says the market outside China is consolidating. This is a map, not a share table.
OEMChemistryListingAngle
NelAlkaline and PEMNEL.OLThe European name the announcement cycle treated as the category leader. Now in an oversupplied OEM market.
thyssenkrupp nuceraAlkalineNCH2.DEChlor-alkali heritage. Competes on large industrial projects, not on fuel cells.
ITM PowerPEMITM.LUK PEM. Factory build-out ran ahead of offtake.
Plug PowerPEM (GenEco)PLUGElectrolyzer is one slice of an integrated (and still loss-making) hydrogen P&L.
Bloom EnergySOECBESame ceramics as the Energy Server, run in reverse. Not what doubled 2026 guidance.
Chinese OEMs (PERIC, LONGi, others)Mostly alkalineNot rosteredIEA: China ~60% of manufacturing and 65% of installed plus FID capacity. Individual names are not on this roster.
Electric HydrogenHigh-current PEMPrivateUS venture-backed. Private comparison, not a listed multiple.
OhmiumModular PEMPrivateFactory-in-a-box model. Private.

Nel Order Intake vs Revenue

NOK million. Intake is orders booked, not sales recognized. Q4 2025 intake spiked on the HYDS PEM award, then fell back.

thyssenkrupp nucera Green Hydrogen Intake vs Sales

gH2 only. Sales can still recognize old NEOM-era work while new intake is lumpy. Q2 2025/26 sales printed negative 33 million euros under IFRS 15.

ITM Power Annual Revenue

Fiscal year ends 30 April. 26.0 million pounds in FY2025, up from 5.2 in FY2023. Product sales were 22.5 million of the FY2025 total.

ITM Power Contracted Backlog

Year-end FY2025 145 million pounds, H1 FY2026 to date 152 million. Backlog is not revenue.

Plug Electrolyzer MW Equivalent Sold

Revenue-recognition count, not commissioned GW. 184 MW-equivalent in FY2025 versus 153 in FY2024. Q2 2026 did not print a figure.

Chart Industries Equipment Backlog

Cryogenic kit into whatever color of hydrogen (and LNG) actually gets built. Q1 2026 $6.28B was the last standalone print before the Baker Hughes close.

Ask Sterling

Register for a premium account to gain access to Sterling AI.

Get Started

Things you can ask Sterling:

Summarize Tesla's latest earnings reportWhy did NVIDIA's margins expand?Compare Apple vs Microsoft's cash flowWhat's driving EV industry growth?
Menu
Favorites
Hydrogen Electrolyzers: Market Data | Sterling