Hydrogen & Fuel Cells
Fuel Cell Companies
Largest Fuel Cell Companies
2025 revenue.
Fuel Cell Chemistries
SOFC
~700-1000 C
- Fuel today
- Natural gas (H2 capable)
- Job
- On-site prime power, 24/7
- Roster names
- Bloom, Ceres (IP)
- The catch
- Slow start. Gas feedstock. Wins when the grid is late, not when H2 is cheap.
PEM
~60-80 C
- Fuel today
- Pure hydrogen
- Job
- Forklifts, buses, trucks, backup
- Roster names
- Plug, Ballard
- The catch
- Needs a hydrogen network. Material handling is the only PEM use that already prints.
MCFC
~600-700 C
- Fuel today
- Natural gas / biogas
- Job
- Industrial CHP, carbon capture pilots
- Roster names
- FuelCell Energy
- The catch
- Has not scaled. Distressed equity. Not a data-center product.
SOEC (reverse SOFC)
~700-800 C
- Fuel today
- Electricity + steam
- Job
- High-efficiency electrolysis
- Roster names
- Bloom (electrolyzer line)
- The catch
- Same ceramics as SOFC. Offtake is the 27-vs-4.3 Mtpa problem, not the stack.
| Chemistry | Temp | Fuel today | Job | Roster names | The catch |
|---|---|---|---|---|---|
| SOFC | ~700-1000 C | Natural gas (H2 capable) | On-site prime power, 24/7 | Bloom, Ceres (IP) | Slow start. Gas feedstock. Wins when the grid is late, not when H2 is cheap. |
| PEM | ~60-80 C | Pure hydrogen | Forklifts, buses, trucks, backup | Plug, Ballard | Needs a hydrogen network. Material handling is the only PEM use that already prints. |
| MCFC | ~600-700 C | Natural gas / biogas | Industrial CHP, carbon capture pilots | FuelCell Energy | Has not scaled. Distressed equity. Not a data-center product. |
| SOEC (reverse SOFC) | ~700-800 C | Electricity + steam | High-efficiency electrolysis | Bloom (electrolyzer line) | Same ceramics as SOFC. Offtake is the 27-vs-4.3 Mtpa problem, not the stack. |
Bloom Energy Annual Revenue
Bloom Product, Install, Service, Electricity
2025.
Bloom Product vs Service Backlog
Year-end 2025.
On-Site Fuel Cell Offtake
Megawatts.
AEP (2024 purchase)
- MW
- 100
- Status
- Contracted 2024
- What it is
- First firm block. Ohio and Texas called out as early sites in 2026 reporting.
AEP option conversion
- MW
- 900
- Status
- Exercised Jan 2026
- What it is
- Turns the 2024 option into 1 GW total. Reported as a $2.65B, 20-year offtake. AEP is the customer; it stays on Utilities.
AEP total framework
- MW
- 1,000
- Status
- Live
- What it is
- Largest disclosed utility SOFC book. This is why Bloom is a generation name, not a hydrogen name.
US hyperscalers + neoclouds
- MW
- Not disclosed as a total
- Status
- Qualified (Bloom Q2 2026)
- What it is
- Bloom said all major US hyperscalers and more than a dozen neoclouds, AI labs, and colo operators have validated the product. No MW roll-up in the PR.
C&I (semiconductor, hospitals, retail)
- MW
- Not disclosed as a total
- Status
- Ongoing
- What it is
- The pre-AI book. Still in the mix; FY2025 growth was 'significant' from AI data centers plus continued C&I.
| Deal | MW | Status | What it is |
|---|---|---|---|
| AEP (2024 purchase) | 100 | Contracted 2024 | First firm block. Ohio and Texas called out as early sites in 2026 reporting. |
| AEP option conversion | 900 | Exercised Jan 2026 | Turns the 2024 option into 1 GW total. Reported as a $2.65B, 20-year offtake. AEP is the customer; it stays on Utilities. |
| AEP total framework | 1,000 | Live | Largest disclosed utility SOFC book. This is why Bloom is a generation name, not a hydrogen name. |
| US hyperscalers + neoclouds | Not disclosed as a total | Qualified (Bloom Q2 2026) | Bloom said all major US hyperscalers and more than a dozen neoclouds, AI labs, and colo operators have validated the product. No MW roll-up in the PR. |
| C&I (semiconductor, hospitals, retail) | Not disclosed as a total | Ongoing | The pre-AI book. Still in the mix; FY2025 growth was 'significant' from AI data centers plus continued C&I. |
Plug Power Annual Revenue
Plug GenDrive Installed Base
Plug Liquid Hydrogen Network
Kingsland / Woodbine, GA
- Nameplate TPD
- 15
- FY2025 output (t)
- Over 2,500
- Note
- Owned. Nameplate April 2024.
Charleston, TN
- Nameplate TPD
- 10
- FY2025 output (t)
- 1,541
- Note
- Owned. Nameplate April 2024.
St. Gabriel, LA (Hidrogenii JV)
- Nameplate TPD
- 15
- FY2025 output (t)
- 561
- Note
- 50/50 with Olin. First liquid H2 April 2025.
Three-plant nameplate
- Nameplate TPD
- About 40
- FY2025 output (t)
- Over 4,600
- Note
- Nameplate, not utilization.
Supplied to customers
- Nameplate TPD
- n/a
- FY2025 output (t)
- Over 5,250
- Note
- Includes third-party hydrogen purchases.
| Site | Nameplate TPD | FY2025 output (t) | Note |
|---|---|---|---|
| Kingsland / Woodbine, GA | 15 | Over 2,500 | Owned. Nameplate April 2024. |
| Charleston, TN | 10 | 1,541 | Owned. Nameplate April 2024. |
| St. Gabriel, LA (Hidrogenii JV) | 15 | 561 | 50/50 with Olin. First liquid H2 April 2025. |
| Three-plant nameplate | About 40 | Over 4,600 | Nameplate, not utilization. |
| Supplied to customers | n/a | Over 5,250 | Includes third-party hydrogen purchases. |
Ballard Power Annual Revenue
FuelCell Energy Annual Revenue
Fiscal year ends 31 October.
Ceres License vs Bloom Manufacturing
| Item | Bloom Energy | Ceres Power |
|---|---|---|
| Model | Manufactures and sells SOFC Energy Servers | Licenses SOFC stack IP; sells kits to partners |
| 2025 revenue print | $2.024B | 32.6 million pounds |
| 2025 mix | Product $1.531B of the total | Engineering and licences 22.2, hardware 10.3, royalties 0.1 (million pounds) |
| Factory print | Own manufacturing (MW nameplate not used on this card) | Doosan 50 MW/year SOP Jul 2025. Bosch ~200 MW plan terminated Feb 2025. |
| Hydrogen in the 2026 P&L | Optionality. 2026 guide is natural-gas SOFC for AI load. | SOEC path with DENSO. Stationary power licences with Doosan, Delta, Weichai. |