Defense
Lockheed Martin logo

Lockheed Martin

Explore Company

$LMT

🇺🇸

World's largest defense contractor by revenue with $71B FY2024 (~99% defense). Producer of F-35 Lightning II, F-22 Raptor, C-130J, Sikorsky helicopters, Aegis combat system, THAAD, PAC-3, Trident D5 SLBM, and classified space programs. $176B backlog at YE 2024. Acquired Aerojet Rocketdyne (2023) for solid rocket motor capacity. Transitioning to 5th-gen + 6th-gen air dominance via NGAD bid (lost to Boeing for F-47).

Key Milestones

Aug 1912
Milestone

Allan and Malcolm Loughead found Alco Hydro-Aeroplane in California (renamed Loughead Aircraft 1916; Lockheed Aircraft 1926). Glenn L. Martin Co founded same year produces JN-4 trainer, B-26 Marauder, B-57 Canberra.

Jun 1943
Milestone

Lockheed Skunk Works (Advanced Development Programs) founded in Burbank by Kelly Johnson; designs P-80 Shooting Star (first US ops jet fighter) in 143 days, then U-2 (1955), SR-71 Blackbird (1964), F-117 Nighthawk (1981), F-22 (1990).

Dec 1976
Product

C-130 Hercules production reaches 1,000th delivery; Lockheed's longest production run, ultimately 2,700+ built across 60+ years through C-130J Super Hercules variants.

Mar 1995
Milestone

Lockheed Corp + Martin Marietta merger closes Mar 15 1995 in $10B deal forming Lockheed Martin Corp; creates world's largest defense contractor with $23B revenue, HQ Bethesda MD; Norman Augustine becomes CEO.

Sep 1996
Launch

F-22 Raptor low-rate initial production authorized; stealth air-superiority fighter enters production phase

Oct 2001
Launch

Wins Joint Strike Fighter (F-35 Lightning II) System Development & Demonstration contract Oct 26 2001 over Boeing X-32; multi-decade $1.7T+ life-cycle program of record across F-35A/B/C variants for 13 partner nations.

Dec 2005
Milestone

F-22 Raptor enters operational service with USAF; first 5th-generation fighter in the world to achieve IOC

Dec 2006
Milestone

F-35A first flight at Fort Worth; conventional takeoff/landing variant begins flight test

Jan 2009
Paused

F-22 Raptor production capped at 187 aircraft by SecDef Robert Gates; line officially closed 2012 after $67B program cost — single most expensive air-superiority fighter program ever.

Feb 2009
Launch

Wins MEADS Medium Extended Air Defense System contract; tri-national US/Germany/Italy program ultimately cancelled 2014, but PAC-3 MSE missile derived from it becomes Patriot's top-tier interceptor.

Aug 2011
Product

Sikorsky CH-53K King Stallion first flight; heavy-lift Marine helicopter program (LMT acquires Sikorsky 2015 for $9B from UTC).

Jul 2015
Milestone

F-35B Lightning II declared Initial Operating Capability with USMC; first 5th-gen STOVL fighter operational

Nov 2015
Expansion

Acquires Sikorsky Aircraft from United Technologies for $9B; adds H-60 Black Hawk, CH-53K King Stallion, Combat Rescue Helicopter to portfolio.

Aug 2016
Milestone

F-35A declared Initial Operating Capability with USAF Hill AFB; conventional variant operational

Dec 2017
Expansion

Announces $4.4B acquisition of Aerojet Rocketdyne to vertically integrate solid rocket motor capacity

Sep 2018
Commercial

Saudi Arabia THAAD Foreign Military Sale finalized Oct 2018; $15B air-defense package — first FMS for THAAD outside UAE.

Aug 2019
Launch

Wins Air Force HACM/AGM-183A ARRW (Air-launched Rapid Response Weapon) hypersonic boost-glide program; later cancelled 2024 after test failures, Pentagon shifts to HACM (RTX).

Feb 2022
Paused

FTC blocks Aerojet Rocketdyne acquisition Jan 2022 citing competition concerns; LMT abandons deal Feb 2022.

Feb 2022
Milestone

Russia invades Ukraine; defense industry inflection: backlog growth, munition stockpile rebuilds, NATO 2% target adoption

May 2022
Expansion

Announces PAC-3 MSE production capacity expansion from 350 to 550/yr post-Ukraine demand surge

Aug 2022
Commercial

HIMARS combat use in Ukraine validates GMLRS/ATACMS munitions; LMT scales HIMARS launcher production from 60/yr to 96/yr.

Sep 2023
Commercial

Germany finalizes purchase of 35 F-35A aircraft for ~$8.4B replacing Tornado nuclear-strike role

Jul 2024
Milestone

F-35 deliveries resume after year-long pause from TR-3 software/hardware upgrade certification issues

Dec 2024
Milestone

F-35 program reaches 1,100+ aircraft delivered globally; cumulative flight hours exceed 950,000.

Mar 2025
Paused

Loses NGAD/F-47 contract to Boeing Mar 21 2025; CEO Jim Taiclet pivots to '5th-gen-plus' upgrade strategy for F-35/F-22

Jun 2025
Expansion

PAC-3 MSE annual production capacity expanded toward 650+ units; backlog stretches into 2027+

Oct 2025
Commercial

Wins $1.7B contract for additional THAAD interceptors; Israel and Saudi defenders deplete stockpile during 2024-25 Iran exchanges.

Jan 2026
Milestone

Backlog hits record $184B at YE 2025; F-35 sustainment contracts and Patriot/PAC-3 export demand drive growth

Mar 2026
Product

F-35 Block 4 Tech Refresh 3 software achieves full operational capability; combat radius and weapons load upgrades unlock new sensor fusion across fleet.

Ask Sterling

Register for a premium account to gain access to Sterling AI.

Get Started

Things you can ask Sterling:

Summarize Tesla's latest earnings reportWhy did NVIDIA's margins expand?Compare Apple vs Microsoft's cash flowWhat's driving the EV sector growth?
Defense - Lockheed Martin | Sterling