TerraPower logoTerraPower

Bill Gates-founded developer of the Natrium sodium-fast reactor with molten-salt thermal storage

Bellevue, WA~1,000Founded 2006$1.48B in two equity raises (2022, 2025) + nearly $2B of planned DOE funding raisedPrivate (no recent secondary marks) valuationwww.terrapower.com
IndustriesNuclear

Market Metrics

DOE ARDP Award

Nearly $2B planned

DOE plan for Natrium, subject to appropriations (Nov 2021)

Natrium Reactor Output

345 MWe + molten-salt storage

Can boost to 500 MWe for more than five and a half hours

Equity Raised (2022 + 2025)

$1.48B

$830M concluded Nov 3 2022 and $650M closed Jun 18 2025; other rounds not printed

Natrium FOAK Target

2030 (Kemmerer, WY)

Revised from original 2028 target (HALEU supply constraint)

Funding History

Total raised: $1.48B in two equity raises (2022, 2025) + nearly $2B of planned DOE funding · Latest valuation: Private (no recent secondary marks)

RoundDateAmountValuationKey Investors
Founding / Early2006-2015Bill Gates personal funding-
Bill GatesVinod Khosla (Khosla Ventures)Charles River Ventures
DOE ARDP AwardOct 2020$80M initial; DOE plans nearly $2B for Natrium, subject to appropriations-
US Department of Energy (Advanced Reactor Demonstration Program)
Equity raiseAug-Nov 2022$830M: a minimum of $750M announced Aug 15 2022 (SK invested $250M), plus $80M more by Nov 3 2022-
Bill GatesSK Inc.SK InnovationArcelorMittal (XCarb Innovation Fund)+1 more
Strategic RoundJun 2025$650M-
NVentures (NVIDIA)Bill GatesHD Hyundai

Product Specifications

SystemTypeStatus
Natrium345 MWe sodium fast reactor + molten-salt thermal storage (can boost to 500 MWe for more than five and a half hours)Under construction (Kemmerer, WY); NRC construction permit authorized Mar 4 2026
MCFR (Molten Chloride Fast Reactor)Liquid-fuel fast reactor conceptR&D (Southern Company JV); MCRE first criticality at INL expected as early as 2027
TerraPower IsotopesMedical isotope production (Ac-225, Cu-67) using HFIR + repurposed cold-war materialCommercial. First Ac-225 commercial supply Dec 2022
Natrium Energy Storage SystemStandalone offering for grid-scale molten-salt thermal storageR&D / commercialization stage
Traveling Wave Reactor (TWR)Original breed-and-burn fast reactor conceptDiscontinued (superseded by Natrium)

Partnerships & Investors

GE Vernova (GE-Hitachi)Strategic

Co-developer of Natrium; supplies the steam-cycle balance-of-plant and integrates GEH BWRX-300 manufacturing infrastructure.

BechtelEPC

Engineering, procurement, and construction partner for the Kemmerer FOAK Natrium plant.

PacifiCorp / Rocky Mountain PowerHost / Offtake

Host utility at Kemmerer; long-term offtake under negotiation.

Southern CompanyStrategic / JV

MCFR joint development; co-funded MCRE pilot at Idaho National Laboratory.

HD HyundaiStrategic / Investor

Jun 2025 round investor; Korean heavy-forging supply for Natrium components.

NVIDIAStrategic / Investor

Jun 2025 round investor via NVentures, its venture capital arm; AI-power thesis links advanced-reactor capacity to datacenter demand.

US Department of Energy (ARDP)Customer / Cost-share

Advanced Reactor Demonstration Program cost share; DOE plans nearly $2B for Natrium, subject to appropriations.

Idaho National LaboratoryResearch

Host site for MCRE pilot; fuel cycle R&D collaboration.

Key Milestones

2006

Company Founded

Spun out of Intellectual Ventures by Nathan Myhrvold and Bill Gates

2008

Traveling Wave Reactor Development

TerraPower's first reactor program, the Traveling Wave Reactor, begins development in 2008, followed by the Molten Chloride Fast Reactor from 2013

Sep 2015

China MOU with CNNC

Memorandum of understanding signed Sep 23 2015 with China National Nuclear Corporation to complete the TWR design and commercialize TWR technology

2020

Natrium Design

345 MWe sodium-cooled fast reactor developed with GE-Hitachi, Bechtel and Energy Northwest, coupled to a molten salt energy storage system that boosts output to 500 MWe

Oct 2020

DOE ARDP Selection

DOE selects TerraPower and X-energy on Oct 13 2020, with $80M in initial funding each and a planned $3.2B over seven years for the two projects, subject to appropriations; DOE plans nearly $2B for Natrium

Nov 2021

Kemmerer WY Site Selected

TerraPower announces plans on Nov 16 2021 to build its Natrium reactor near the retiring Naughton coal plant in Kemmerer, Wyoming

Mar 2024

NRC Construction Permit Application

Submitted Mar 28 2024 and docketed by the NRC on May 21 2024; TerraPower says it is the first to submit a construction permit application for a commercial advanced reactor to the NRC

Jun 2024

Groundbreaking (non-nuclear)

Start of construction marked Jun 10 2024; non-nuclear construction starts first and nuclear construction follows NRC approval

Jun 2025

$650M Round with NVIDIA + HD Hyundai

Close of a $650M fundraise announced Jun 18 2025; new investors include NVentures, NVIDIA's venture capital arm, and current investors include Bill Gates and HD Hyundai; further terms not disclosed

Jan 2026

Meta Natrium Deal

Agreement with Meta for up to eight 345 MWe Natrium plants to power data centers

Mar 2026

NRC Construction Permit

NRC Commission votes on Mar 4 2026 to authorize the Kemmerer Unit 1 construction permit; TerraPower announces the official start of construction on Apr 23 2026

Oct 2026

Molten Chloride Reactor Experiment

DOE approves cost-shared funding for an accelerated final stage of MCRE under ARDP, supporting Southern Company, Idaho National Laboratory and CORE POWER; first criticality expected as early as 2027

2030 (revised target)

Natrium FOAK Completion

TerraPower expects Kemmerer Unit 1 to be completed in 2030; the original 2028 target slipped due to HALEU fuel supply constraints

KPI data tables

TerraPower operating metrics behind the KPI charts, newest period first (up to 24 periods per chart). Periods use each company's own fiscal labels where the source does; each table names its source.

TerraPower Disclosed Private Round Sizes (usd_millions)
PeriodRound size ($M)
2025-06 NVentures round650
2022 equity raise830

Source: src/data/kpis/terrapower/funding-rounds-table.json

Frequently asked questions

What does TerraPower do?

Bill Gates-founded developer of the Natrium 345 MWe sodium-fast reactor with molten-salt thermal storage. Kemmerer Wyoming first-of-a-kind site (NRC Commission voted Mar 4 2026 to authorize the construction permit; construction started Apr 23 2026; completion expected in 2030). DOE plans nearly $2B for the Natrium project in its Advanced Reactor Demonstration Program, subject to appropriations. TerraPower was founded in 2006, is headquartered in Bellevue, WA and employs ~1,000.

How much funding has TerraPower raised?

TerraPower has raised $1.48B in two equity raises (2022, 2025) + nearly $2B of planned DOE funding in total at a Private (no recent secondary marks) valuation, based on the funding rounds Sterling tracks.

Who are TerraPower's main competitors?

Sterling groups TerraPower in the Nuclear industry, alongside NuScale Power (SMR), Oklo (OKLO), NANO Nuclear Energy (NNE), X-energy (private), Kairos Power (private) and Last Energy (private).

If I'm investing in TerraPower, what similar companies should I consider?

If you are researching TerraPower, also look at NuScale Power (SMR), Oklo (OKLO) and NANO Nuclear Energy (NNE). You can compare all of them side by side or browse the full Nuclear industry on Sterling.

Ask Sterling

Register for a premium account to gain access to Sterling AI.

Get Started

Things you can ask Sterling:

Summarize Tesla's latest earnings reportWhy did NVIDIA's margins expand?Compare Apple vs Microsoft's cash flowWhat's driving EV industry growth?
Menu
Favorites