SMR & Advanced Reactor Developers
17 of 17 credible SMR and advanced reactor developers building civilian commercial-power designs. One row per design / deployment path (X-energy appears twice: US Xe-100 and KGHM Poland deployment). Excludes DoD-only programs (Project Pele) and naval propulsion. MWe is single-unit net output. Funding is cumulative dollar funding including DOE cost-share, private equity, IPO / SPAC proceeds, and strategic equity. Sources: NRC Design Certifications and Approvals, NRC New Reactor Pre-Application Activities, DOE Advanced Reactor Demonstration Program, Third Way Advanced Nuclear Map, NEI Advanced Reactor Tracker.
NRC Licensing Pipeline
10 developers
Holtec International
SMR-300
Westinghouse Electric
AP300
Rolls-Royce SMR
Rolls-Royce SMR 470 MWe
Oklo
Aurora Powerhouse
Last Energy
PWR-20
Aalo Atomics
Aalo-1 / Aalo-X test article
Radiant Nuclear
Kaleidos
BWXT Advanced Technologies
BANR (civilian)
Antares Industries
Antares microreactor (civilian)
X-energy KGHM Poland
Xe-100 Polish deployment
0 developers
none
1 developer
NuScale Power
VOYGR 77 MWe
3 developers
GE Vernova Hitachi Nuclear Energy
BWRX-300
TerraPower
Natrium
X-energy
Xe-100 (Dow Seadrift)
0 developers
none
3 developers
Kairos Power
KP-FHR (Hermes demo)
NANO Nuclear Energy
KRONOS MMR
Standard Nuclear (former USNC commercial assets)
MMR
0 developers
none
Each developer placed at its current NRC pipeline stage. Stages run left to right from least to most mature. NuScale was first US SMR to achieve design certification (50 MWe, Jan 2023); the 77 MWe variant is in standard design approval. Kairos Hermes received the first non-LWR construction permit (Dec 2023). The ADVANCE Act 2024 modifies the pipeline structure via NRC Part 53 risk-informed framework. Source: NRC docket page, NRC pre-application activities tracker.
Advanced Reactor Funding by Year
Annual capital flowing into US advanced reactor + SMR developers 2020-2025 in $M. The 2020 baseline reflects DOE ARDP awards (TerraPower $1.99B + X-energy $1.23B kickoff). 2024 shows the hyperscaler-strategic spike (Amazon X-energy Series C-1, Equinix Oklo MoU, Google Kairos PPA). Sources: DOE ARDP and LPO press, company filings, Crunchbase, PitchBook.
DOE Civilian Advanced-Nuclear Awards
Filtered awards
20
of 20 tracked
Total ($M)
$9,540
across visible rows
Scope
Civilian only
Project Pele (DoD) excluded
Top DOE civilian advanced-nuclear awards 2020-2026: ARDP demonstration + risk-reduction, NRIC, GAIN voucher, HALEU Consortium, Civil Nuclear Credit, LPO conditional loan guarantees. Project Pele (BWXT DoD microreactor) is excluded by scope: this sector tracks civilian commercial nuclear power only. Sources: DOE Office of Nuclear Energy + LPO press releases.
Microreactor Landscape
Civilian power scope: sub-50 MWe civilian microreactor designs only. DoD-only programs (Project Pele BWXT, Antares defense variants) are out of scope. For dual-use developers (Radiant, Antares, Oklo), only the civilian-power application path is shown.
Civilian sub-50 MWe microreactor designs targeting remote industrial, data center, Arctic / process-heat, or distributed utility-grid customers. HALEU (5-19.75% U-235) is the dominant fuel form; cooling design varies (heat pipe, gas, liquid metal, molten salt). FOAK timelines are aspirational; bracketed values are independent-assessor estimates. Sources: company filings, NRC pre-application docket, DOE Demonstration Programs.
First-of-a-Kind Commercial Operation Timeline
BWRX-300
PWR-20
KP-FHR (Hermes demo)
Aurora Powerhouse
SMR-300
Natrium
MMR
Xe-100 (Dow Seadrift)
VOYGR 77 MWe
AP300
Rolls-Royce SMR 470 MWe
Aalo-1 / Aalo-X test article
Kaleidos
KRONOS MMR
Xe-100 Polish deployment
BANR (civilian)
Antares microreactor (civilian)
First-of-a-kind (FOAK) commercial-operation timeline for all 17 SMR + advanced reactor developers, sorted by company-stated FOAK year. Each marker is a milestone (regulatory, construction, or operational). Disputed badge flags developers whose stated timelines diverge materially from independent-assessor estimates (e.g., Last Energy's 2025-2026 commercial claims, Oklo's 2027-2028 FOAK, NANO Nuclear's near-term timelines). Source: company filings + NRC docket events + Third Way Advanced Nuclear Map analyst notes.