Nuclear SMRs & Advanced

SMR & Advanced Reactor Developers

All 17 credible SMR and advanced-reactor developers building civilian commercial-power designs, filterable by technology family and country. Funding is cumulative.

Technology:
Country:
Sort:

X-energy XE (Nasdaq)

Xe-100 (4-pack 320 MWe standard plant)

$3,730M

80 MWe

HTGRUnited Statesconstruction permit

FOAK
early 2030s
Backers
Amazon (anchor of Series C-1), DOE ARDP ($1.2B initial award, 50/50 cost share), Energy Northwest, Dow Chemical, Ares Management, Ontario Power Generation

TerraPower private

Natrium (sodium fast + molten-salt energy storage)

$3,480M

345 MWe

SFRUnited Statesconstruction permit

FOAK
2030 (TerraPower: ARDP project expected completed in 2030)
Backers
Bill Gates (founder), SK Inc and SK Innovation, HD Hyundai, NVentures (NVIDIA), GE Hitachi Nuclear (Natrium technology partner), PacifiCorp (utility partner), DOE ARDP

Holtec International private

SMR-300

$1,840M

340 MWe

PWRUnited Statesconstruction permit

FOAK
early 2030s (Holtec S-1/A, Sep 8 2026)
Backers
DOE LPO, Hyundai Engineering & Construction, Mitsubishi Electric Power Products

Oklo OKLO

Aurora Powerhouse (15 MWe initial; 50/75 MWe upgrades)

$1,601M

15 MWe

LFRUnited Statestopical report

FOAK
2028 (Oklo target; Oklo 10-Q, Aug 7 2026)
Backers
Sam Altman (former chair, recused as of 2024), Peter Thiel / Mithril, DCVC, ARCH Venture, AltC, public market

NuScale Power SMR

VOYGR (4/6/12-pack)

$850M

77 MWe

PWRUnited Statesdesign cert

FOAK
post-2030
Backers
Fluor Corp (former majority holder, fully divested by Jun 30 2026), DOE (UAMPS cost-share previously ~$1.4B authorized; UAMPS cancelled Nov 8, 2023), Doosan, JGC, IHI

Rolls-Royce SMR RYCEY (Rolls-Royce Holdings)

Rolls-Royce SMR

$670M

470 MWe

PWRUnited Kingdomnone

FOAK
mid-2030s (UK Government ambition for Wylfa power to the grid; GOV.UK, Nov 13 2025)
Backers
Rolls-Royce Holdings, BNF Resources, Constellation Energy (formerly Exelon Generation), Qatar Investment Authority, UK Treasury / Great British Nuclear

NANO Nuclear Energy NNE

Zeus (5 MWe solid-core, KRONOS commercial pilot); ODIN (gas-cooled microreactor)

$639M

5 MWe

MicroreactorUnited Statesconstruction permit

FOAK
~2030 (company expectation of initial operation at UIUC)
Backers
Public retail (IPO), GEM Global Yield, Yvan Adam, Jay Yu (chairman); HEU.IQ acquisition Apr 2024

Antares Industries private

Antares microreactor (civilian remote-power configuration)

$504M

1.5 MWe

MicroreactorUnited Statespre-application

FOAK
2027 (Mark-1 electricity at INL; Antares, Oct 23 2026); Antares targets initial military-installation deployments by 2028 (outside this table's civilian scope)
Backers
Paradigm and Caffeinated Capital (Series C co-leads), Point72 Ventures, Shine Capital, Industrious Ventures, Andreessen Horowitz, Trousdale Ventures, Founders Fund

Radiant Nuclear private

Kaleidos (portable microreactor)

$488M

1.2 MWe

MicroreactorUnited Statespre-application

FOAK
2026 (Kaleidos fueled experiment in DOME; DOE, May 23 2026)
Backers
Investors are not named in its SEC Form D filings (40 investors in the Dec 2025 offering); DOE (DOME test bed access)

Standard Nuclear (former USNC commercial assets) STDN (NYSE)

TRISO fuel (no reactor design)

$321M

0 MWe

TRISOUnited Statesnone

FOAK
2H 2026 (Oak Ridge SN-TN fuel plant operational); Richland TRISO manufacturing 2027 (joint venture plan); up to 40 MTU run-rate no earlier than 2030
Backers
Decisive Point Group, Welara Capital Partners, Fundomo, Washington Harbour Partners (each holds more than 5% of a class of its capital stock; prospectus, Jul 16 2026); DOE (fuel line agreement, Sep 26 2025); Framatome (Richland joint venture partner)

Aalo Atomics private

Aalo-1 (XMR, ARC-100 derivative)

$300M

10 MWe

SFRUnited Statespre-application

FOAK
2027 (Aalo target: a 10 MWe reactor powering an on-site data center at INL; Aalo, Jul 4 2026)
Backers
Valor Equity Partners, Hitachi Ventures, Harpoon Ventures, DOE GAIN voucher

Last Energy private

PWR-20

$164M

20 MWe

PWRUnited States (Austin, TX HQ)none

FOAK
2027 (first Wales plant, contingent on licensing and planning; Last Energy, Oct 15 2024)
Backers
Astera Institute (Series C lead), Gigafund (Series B lead), Autodesk Foundation, JAM Fund, The Haskell Company, AE Ventures, Ultranative, Galaxy Interactive, Woori Technology, Bret Kugelmass (founder and CEO)

BWXT Advanced Technologies BWXT

BANR (BWXT Advanced Nuclear Reactor, civilian)

$106M

22 MWe

HTGRUnited Statespre-application

FOAK
early 2030s in service (company target, Prodigy Belledune, New Brunswick); near-term BWXT revenue is TRISO fuel supply to other developers
Backers
BWXT Inc, DOE ARDP, TRISO fuel customer base (X-energy, USNC, Kairos)

GE Vernova Hitachi Nuclear Energy GEV

BWRX-300

n/a

300 MWe

BWRUnited Statesconstruction permit

FOAK
2030 (Darlington Unit 1: GE Vernova says commercial operation by the end of 2030); early 2030s (TVA Clinch River; GE Vernova Hitachi, Dec 2 2025)
Backers
GE Vernova, Hitachi, Ontario Power Generation, Tennessee Valley Authority, Synthos Green Energy (Poland), Fermi Energia (Estonia)

Westinghouse Electric private

AP300

n/a

300 MWe

PWRUnited Statespre-application

FOAK
early 2030s (Westinghouse plans an operating unit in the early 2030s; Sep 10 2024)
Backers
Cameco Corp, Brookfield Renewable Partners, Brookfield Asset Management

Kairos Power private

KP-FHR (Hermes demo 35 MWth; commercial plant of two 75 MWe reactors, 150 MWe)

n/a

75 MWe

FHRUnited Statesconstruction permit

FOAK
2030 (Hermes 2 begins operations under the TVA power purchase agreement for Google; Kairos, Aug 18 2025)
Backers
Google (Master Plant Development Agreement offtake), Samsung C&T (strategic investment of up to $100M), DOE ARDP, Bechtel (EPC partner), Materion (Flibe salt supplier), Fluor Corp

KGHM Polska Miedź KGH.WA (KGHM Polska Miedz)

NuScale NPM-20 SMR project (6 modules, 462 MWe configuration)

n/a

77 MWe

PWRPolandnone

FOAK
2029 (KGHM target, Feb 14 2022); KGHM's Q1 2026 results presentation says no binding SMR discussions are underway (May 14 2026)
Backers
KGHM Polska Miedz SA (sponsor), NuScale Power (technology partner), Polish National Atomic Energy Agency (regulator)
CompanyTickerCountryDesignTechMWeNRC StatusFOAK TargetFunding ($M)▼Key BackersSource
X-energyXE (Nasdaq)United StatesXe-100 (4-pack 320 MWe standard plant)HTGR80construction permitearly 2030s3,730Amazon (anchor of Series C-1), DOE ARDP ($1.2B initial award, 50/50 cost share), Energy Northwest, Dow Chemical, Ares Management, Ontario Power Generation
TerraPowerprivateUnited StatesNatrium (sodium fast + molten-salt energy storage)SFR345construction permit2030 (TerraPower: ARDP project expected completed in 2030)3,480Bill Gates (founder), SK Inc and SK Innovation, HD Hyundai, NVentures (NVIDIA), GE Hitachi Nuclear (Natrium technology partner), PacifiCorp (utility partner), DOE ARDP
Holtec InternationalprivateUnited StatesSMR-300PWR340construction permitearly 2030s (Holtec S-1/A, Sep 8 2026)1,840DOE LPO, Hyundai Engineering & Construction, Mitsubishi Electric Power Products
OkloOKLOUnited StatesAurora Powerhouse (15 MWe initial; 50/75 MWe upgrades)LFR15topical report2028 (Oklo target; Oklo 10-Q, Aug 7 2026)1,601Sam Altman (former chair, recused as of 2024), Peter Thiel / Mithril, DCVC, ARCH Venture, AltC, public market
NuScale PowerSMRUnited StatesVOYGR (4/6/12-pack)PWR77design certpost-2030850Fluor Corp (former majority holder, fully divested by Jun 30 2026), DOE (UAMPS cost-share previously ~$1.4B authorized; UAMPS cancelled Nov 8, 2023), Doosan, JGC, IHI
Rolls-Royce SMRRYCEY (Rolls-Royce Holdings)United KingdomRolls-Royce SMRPWR470nonemid-2030s (UK Government ambition for Wylfa power to the grid; GOV.UK, Nov 13 2025)670Rolls-Royce Holdings, BNF Resources, Constellation Energy (formerly Exelon Generation), Qatar Investment Authority, UK Treasury / Great British Nuclear
NANO Nuclear EnergyNNEUnited StatesZeus (5 MWe solid-core, KRONOS commercial pilot); ODIN (gas-cooled microreactor)Microreactor5construction permit~2030 (company expectation of initial operation at UIUC)639Public retail (IPO), GEM Global Yield, Yvan Adam, Jay Yu (chairman); HEU.IQ acquisition Apr 2024
Antares IndustriesprivateUnited StatesAntares microreactor (civilian remote-power configuration)Microreactor1.5pre-application2027 (Mark-1 electricity at INL; Antares, Oct 23 2026); Antares targets initial military-installation deployments by 2028 (outside this table's civilian scope)504Paradigm and Caffeinated Capital (Series C co-leads), Point72 Ventures, Shine Capital, Industrious Ventures, Andreessen Horowitz, Trousdale Ventures, Founders Fund
Radiant NuclearprivateUnited StatesKaleidos (portable microreactor)Microreactor1.2pre-application2026 (Kaleidos fueled experiment in DOME; DOE, May 23 2026)488Investors are not named in its SEC Form D filings (40 investors in the Dec 2025 offering); DOE (DOME test bed access)
Standard Nuclear (former USNC commercial assets)STDN (NYSE)United StatesTRISO fuel (no reactor design)TRISO0none2H 2026 (Oak Ridge SN-TN fuel plant operational); Richland TRISO manufacturing 2027 (joint venture plan); up to 40 MTU run-rate no earlier than 2030321Decisive Point Group, Welara Capital Partners, Fundomo, Washington Harbour Partners (each holds more than 5% of a class of its capital stock; prospectus, Jul 16 2026); DOE (fuel line agreement, Sep 26 2025); Framatome (Richland joint venture partner)
Aalo AtomicsprivateUnited StatesAalo-1 (XMR, ARC-100 derivative)SFR10pre-application2027 (Aalo target: a 10 MWe reactor powering an on-site data center at INL; Aalo, Jul 4 2026)300Valor Equity Partners, Hitachi Ventures, Harpoon Ventures, DOE GAIN voucher
Last EnergyprivateUnited States (Austin, TX HQ)PWR-20PWR20none2027 (first Wales plant, contingent on licensing and planning; Last Energy, Oct 15 2024)164Astera Institute (Series C lead), Gigafund (Series B lead), Autodesk Foundation, JAM Fund, The Haskell Company, AE Ventures, Ultranative, Galaxy Interactive, Woori Technology, Bret Kugelmass (founder and CEO)
BWXT Advanced TechnologiesBWXTUnited StatesBANR (BWXT Advanced Nuclear Reactor, civilian)HTGR22pre-applicationearly 2030s in service (company target, Prodigy Belledune, New Brunswick); near-term BWXT revenue is TRISO fuel supply to other developers106BWXT Inc, DOE ARDP, TRISO fuel customer base (X-energy, USNC, Kairos)
GE Vernova Hitachi Nuclear EnergyGEVUnited StatesBWRX-300BWR300construction permit2030 (Darlington Unit 1: GE Vernova says commercial operation by the end of 2030); early 2030s (TVA Clinch River; GE Vernova Hitachi, Dec 2 2025)n/aGE Vernova, Hitachi, Ontario Power Generation, Tennessee Valley Authority, Synthos Green Energy (Poland), Fermi Energia (Estonia)
Westinghouse ElectricprivateUnited StatesAP300PWR300pre-applicationearly 2030s (Westinghouse plans an operating unit in the early 2030s; Sep 10 2024)n/aCameco Corp, Brookfield Renewable Partners, Brookfield Asset Management
Kairos PowerprivateUnited StatesKP-FHR (Hermes demo 35 MWth; commercial plant of two 75 MWe reactors, 150 MWe)FHR75construction permit2030 (Hermes 2 begins operations under the TVA power purchase agreement for Google; Kairos, Aug 18 2025)n/aGoogle (Master Plant Development Agreement offtake), Samsung C&T (strategic investment of up to $100M), DOE ARDP, Bechtel (EPC partner), Materion (Flibe salt supplier), Fluor Corp
KGHM Polska MiedźKGH.WA (KGHM Polska Miedz)PolandNuScale NPM-20 SMR project (6 modules, 462 MWe configuration)PWR77none2029 (KGHM target, Feb 14 2022); KGHM's Q1 2026 results presentation says no binding SMR discussions are underway (May 14 2026)n/aKGHM Polska Miedz SA (sponsor), NuScale Power (technology partner), Polish National Atomic Energy Agency (regulator)

SMR + Advanced Reactor Funding Per Kilowatt-Design

Cumulative public + private funding divided by intended FOAK nameplate output ($/kW-design). A capital-intensity gauge, not lifetime construction cost. Click a column to sort.

DeveloperDesignTarget MWeCumulative Funding ($M)Public Share %$/kW-design ↑Design Type
TerraPower (private)Natrium (Na-cooled)345$3,48057%$10,087Sodium-cooled
X-energy (private)Xe-100 (HTGR)80$2,629.946%$32,874High-temp gas (HTGR)
NuScale (SMR)VOYGR (BWR-based)924n/dn/dn/dLWR-SMR
GE Vernova (GEV)BWRX-300300n/dn/dn/dLWR-SMR
Westinghouse (private)AP300300n/dn/dn/dLWR-SMR
Holtec International (private)SMR-300300n/dn/dn/dLWR-SMR
Rolls-Royce SMR (RR.L)Rolls-Royce SMR470n/dn/dn/dLWR-SMR
Last Energy (private)PWR-2020n/dn/dn/dLWR-microreactor
NANO Nuclear (NNE)ZEUS + Odin + KRONOSn/d$638.90%n/dLWR-microreactor
Kairos Power (private)Hermes + KP-FHR150n/dn/dn/dFluoride-salt (FHR)
Oklo (OKLO)Aurora (15 to 75 MWe product line)n/d$1,601.20%n/dSodium-cooled microreactor
BWX Technologies (BWXT)BANR + Pele microreactor50n/dn/dn/dHTGR microreactor

NRC Licensing Pipeline

Where each developer sits in the NRC licensing pipeline, least to most mature. NuScale holds the design approvals; Kairos Hermes, TerraPower Kemmerer and TVA Clinch River hold construction permits.

pre-application

10 developers

Westinghouse Electric

AP300

Rolls-Royce SMR

Rolls-Royce SMR 470 MWe

Oklo

Aurora Powerhouse

Last Energy

PWR-20

Aalo Atomics

Aalo-1 / Aalo-X test article

Radiant Nuclear

Kaleidos

Standard Nuclear (former USNC commercial assets)

TRISO fuel (no reactor design)

BWXT Advanced Technologies

BANR (civilian)

Antares Industries

Antares microreactor (civilian)

KGHM Polska Miedź

NuScale NPM-20 SMR project

topical report

0 developers

none

design cert / SDA

1 developer

NuScale Power

VOYGR 77 MWe

COL submittal

3 developers

Holtec International

SMR-300

X-energy

Xe-100 (Dow Seadrift)

NANO Nuclear Energy

KRONOS MMR

COL granted

0 developers

none

construction permit

3 developers

GE Vernova Hitachi Nuclear Energy

BWRX-300

TerraPower

Natrium

Kairos Power

KP-FHR (Hermes demo)

operational

0 developers

none

Advanced Reactor Funding by Year

Annual capital into US SMR and advanced-reactor developers, 2020-2025, split by public, VC, post-IPO, and strategic hyperscaler funding.

DOE Civilian Advanced-Nuclear Awards

Top DOE civilian advanced-nuclear awards, 2020-2026, across ARDP, NRIC, the HALEU Consortium, Civil Nuclear Credit, and LPO loan guarantees. Civilian power only.

Filtered awards

18

of 18 tracked

Total ($M)

$12,449.4

across filtered awards

Scope

Civilian only

Project Pele (DoD) excluded

Program:
Sort:

Vistra

2026-10-05

$4,200M

LPO conditional commitment

Uprates and modernization at the Beaver Valley, Davis-Besse and Perry nuclear plants; DOE says it would preserve nearly 4 GW and add 433 MW, with an option to finance Comanche Peak uprates. Basis: DOE conditional commitment amount, not closed.

TerraPower

2020-10-13

$2,000M

ARDP demonstration

Cost-share for Natrium reactor demonstration (Kemmerer Wyoming FOAK). Basis: DOE share, nearly $2B planned and subject to appropriations (DOE, Nov 16 2021).

Holtec International

2024-09-30

$1,520M

LPO loan guarantee (closed Sep 2024)

Palisades 800 MW restart + SMR-300 site preparation, Covert Township, Michigan. Basis: DOE loan guarantee amount.

X-energy

2020-10-13

$1,200M

ARDP demonstration

Cost-share for Xe-100 reactor demonstration (Dow Seadrift + Energy Northwest). Basis: DOE share, an award initially $1.2B with 50/50 cost share (X-energy prospectus, Apr 23 2026).

Pacific Gas & Electric / Diablo Canyon

2022-11-21

$1,100M

DOE Civil Nuclear Credit Program (first round)

First Civil Nuclear Credit award, supporting Diablo Canyon's continued operation through 2030 (state-mandated extension). Selected Nov 2022; DOE signed the credit award and payment agreement with PG&E on Jan 17 2024. Basis: DOE Civil Nuclear Credit award amount.

Constellation Energy

2025-11-18

$1,000M

LPO loan (closed)

Three Mile Island Unit 1 / Crane Clean Energy Center restart financing support, Londonderry Township PA. Basis: DOE loan amount, closed.

Kairos Power

2020-12-16

$303M

ARDP risk-reduction

KP-FHR demonstration risk-reduction; Hermes demonstration cost-share. Basis: DOE share; the total award value over seven years is $629M.

Urenco USA

2024-01-09

$175M

HALEU Consortium

HALEU enrichment capacity expansion Eunice New Mexico (target 2027-2028). Basis: DOE award amount.

DateAwardeeProgram$M▼Purpose
2026-10-05VistraLPO conditional commitment4,200Uprates and modernization at the Beaver Valley, Davis-Besse and Perry nuclear plants; DOE says it would preserve nearly 4 GW and add 433 MW, with an option to finance Comanche Peak uprates. Basis: DOE conditional commitment amount, not closed.
2020-10-13TerraPowerARDP demonstration2,000Cost-share for Natrium reactor demonstration (Kemmerer Wyoming FOAK). Basis: DOE share, nearly $2B planned and subject to appropriations (DOE, Nov 16 2021).
2024-09-30Holtec InternationalLPO loan guarantee (closed Sep 2024)1,520Palisades 800 MW restart + SMR-300 site preparation, Covert Township, Michigan. Basis: DOE loan guarantee amount.
2020-10-13X-energyARDP demonstration1,200Cost-share for Xe-100 reactor demonstration (Dow Seadrift + Energy Northwest). Basis: DOE share, an award initially $1.2B with 50/50 cost share (X-energy prospectus, Apr 23 2026).
2022-11-21Pacific Gas & Electric / Diablo CanyonDOE Civil Nuclear Credit Program (first round)1,100First Civil Nuclear Credit award, supporting Diablo Canyon's continued operation through 2030 (state-mandated extension). Selected Nov 2022; DOE signed the credit award and payment agreement with PG&E on Jan 17 2024. Basis: DOE Civil Nuclear Credit award amount.
2025-11-18Constellation EnergyLPO loan (closed)1,000Three Mile Island Unit 1 / Crane Clean Energy Center restart financing support, Londonderry Township PA. Basis: DOE loan amount, closed.
2020-12-16Kairos PowerARDP risk-reduction303KP-FHR demonstration risk-reduction; Hermes demonstration cost-share. Basis: DOE share; the total award value over seven years is $629M.
2024-01-09Urenco USAHALEU Consortium175HALEU enrichment capacity expansion Eunice New Mexico (target 2027-2028). Basis: DOE award amount.
2024-01-09Orano USAHALEU Consortium175HALEU enrichment proposal Tennessee or Kentucky (siting TBD; ~10 MTU per year target). Basis: DOE award amount.
2024-01-09BWXT Advanced TechnologiesHALEU Consortium / Production task order175HALEU downblending from existing US HEU stockpile at BWXT Lynchburg Virginia. Basis: DOE award amount.
2024-01-09Centrus EnergyHALEU Consortium / DOE LEU+ Procurement150Centrus Piketon AC100M HALEU cascade Phase 1 production contract (10 yr indefinite delivery / indefinite quantity ~$2B+ ceiling; initial obligation $150M; first 20 kg delivered Oct 2023). Basis: DOE initial obligation, not the contract ceiling.
2020-12-16Holtec InternationalARDP risk-reduction147.5Holtec SMR-160 risk-reduction (predecessor of SMR-300). Total award value over seven years $147.5M (DOE share $116M). Basis: total award value.
2020-12-16Southern Company ServicesARDP risk-reduction113Molten Chloride Reactor Experiment (MCRE) at Idaho National Laboratory, led by Southern Company Services: world's first critical fast-spectrum salt reactor, relevant to TerraPower's Molten Chloride Fast Reactor. Total award value over seven years $113M (DOE share $90.4M); in Oct 2026 DOE approved cost-shared funding for an accelerated final stage, with first criticality targeted as early as 2027. Basis: total award value.
2020-12-16BWXT Advanced TechnologiesARDP risk-reduction106.6BANR (BWXT Advanced Nuclear Reactor) civilian SMR design. Total award value over seven years $106.6M (DOE share $85.3M). Basis: total award value.
2024-01-09ASP IsotopesHALEU Consortium75HALEU laser-based enrichment R&D and commercial scale-up. Basis: DOE award amount.
2020-12-16WestinghouseARDP risk-reduction9.3eVinci heat pipe-cooled microreactor design (moderator canister, heat pipe wicks, refueling process). Total award value over seven years $9.3M (DOE share $7.4M). Basis: total award value.
2025-07-01Radiant NuclearNRIC DOME microreactor test bed0DOE conditional selection to run one of the first two fueled tests in the DOME test bed at INL (Kaleidos Development Unit); DOE says the testing campaigns are self-funded by the applicants. Basis: no DOE dollars; the applicants fund the tests.
2025-07-01WestinghouseNRIC DOME microreactor test bed0DOE conditional selection to run one of the first two fueled tests in the DOME test bed at INL (eVinci Nuclear Test Reactor); DOE says the testing campaigns are self-funded by the applicants. Basis: no DOE dollars; the applicants fund the tests.

Microreactor Landscape

Civilian sub-50 MWe microreactor designs by fuel, cooling, target customer, and first-of-a-kind year. Defense-only programs are out of scope.

Civilian power scope: sub-50 MWe civilian microreactor designs only. DoD-only programs (Project Pele BWXT, Antares defense variants) are out of scope. For dual-use developers (Radiant, Antares, Oklo), only the civilian-power application path is shown.

Aalo Atomics

Aalo-1 (XMR, ARC-100 derivative)

10 MWe

liquid metal (sodium)HALEU (UN+U-Zr metal)
Customer
data center campus, utility grid (factory-built modular for hyperscaler data center sites)
FOAK
2027 (Aalo target: a 10 MWe reactor powering an on-site data center at INL; Aalo, Jul 4 2026)
Demo site
Idaho National Laboratory (Aalo-X zero-power fueled criticality Jul 4 2026); Texas commercial campus pending site selection

Antares Industries

Antares microreactor (civilian remote-power configuration)

1.5 MWe

gas (helium)HALEU TRISO
Customer
remote industrial, process heat, off-grid utility
FOAK
2027 (Mark-1 electricity-producing reactor at INL; Antares, Oct 23 2026)
Demo site
Idaho National Laboratory (Mark-0 criticality Jun 4 2026; Mark-1 planned for 2027); civilian site TBD

Radiant Nuclear

Kaleidos (portable microreactor)

1.2 MWe

gas (helium)HALEU TRISO
Customer
remote industrial, mining, off-grid utility, Arctic / remote-community power
FOAK
2026 (Kaleidos fueled experiment in the DOME test bed; DOE, May 23 2026)
Demo site
Idaho National Laboratory DOME test bed (conditionally selected Jul 1 2025; fueled experiment on track for 2026)

Westinghouse

eVinci microreactor

5 MWe

heat pipe (sodium-potassium)HALEU TRISO
Customer
remote industrial, process heat, university research, mining
FOAK
Not stated (conditionally selected for a DOME fueled test, Jul 1 2025)
Demo site
Idaho National Laboratory DOME test bed (conditionally selected Jul 1 2025)

NANO Nuclear Energy

Zeus (solid-core); ODIN (gas-cooled); KRONOS MMR pilot

5 MWe

heat pipe (Zeus) / gas (ODIN) / FHR (KRONOS pilot)HALEU TRISO
Customer
remote industrial, process heat, university campus (KRONOS pilot UIUC); aspirational data-center deployments
FOAK
around 2030 (KRONOS MMR initial operation at UIUC; NANO 10-Q, Aug 12 2026); early 2030s commercial launch
Demo site
University of Illinois Urbana-Champaign (KRONOS MMR construction permit application docketed May 18 2026); site TBD for Zeus / ODIN

Kairos Power

Hermes demo (35 MWth, ~10 MWe equivalent)

10 MWe

molten salt (Flibe, fluoride-lithium-beryllium)HALEU TRISO (Flibe-cooled FHR fuel)
Customer
utility grid (Hermes 2 will deliver up to 50 MW to the TVA grid for Google data centers under a power purchase agreement; Hermes 1 is a low-power test reactor)
FOAK
2028 (Kairos expects Hermes 1 construction to finish); 2030 (Hermes 2 begins operations; Kairos, Aug 18 2025)
Demo site
Oak Ridge, Tennessee (East Tennessee Technology Park)

Oklo

Aurora Powerhouse (15 MWe initial)

15 MWe

liquid metal (sodium pool)HALEU metal fuel (U-10Zr alloy)
Customer
utility grid, data center campus, remote industrial; commercial customer letters of intent total ~14 GWe (Equinix 500 MW MoU, Switch 12 GW MoU, Diamondback Energy, Wyoming Hyperscale)
FOAK
2028 (Oklo target; Oklo 10-Q, Aug 7 2026)
Demo site
Idaho National Laboratory (DOE site use permit)

Deployable Energy

Nuclear Unity Battery (1 MWe, company-stated)

1 MWe

gas cooledNot stated in the DOE or company releases
Customer
Not stated in the DOE or company releases
FOAK
Zero-power criticality at INL on Jun 30 2026; selected for a full-power demonstration in the DOME test bed (company, Oct 7 2026)
Demo site
Idaho National Laboratory (NRIC zero-power test; DOME for the full-power demonstration)
Company / ModelMWeFuelCoolingCivilian target customerFOAKDemo site

Aalo Atomics

Aalo-1 (XMR, ARC-100 derivative)

10HALEU (UN+U-Zr metal)liquid metal (sodium)data center campus, utility grid (factory-built modular for hyperscaler data center sites)2027 (Aalo target: a 10 MWe reactor powering an on-site data center at INL; Aalo, Jul 4 2026)Idaho National Laboratory (Aalo-X zero-power fueled criticality Jul 4 2026); Texas commercial campus pending site selection

Antares Industries

Antares microreactor (civilian remote-power configuration)

1.5HALEU TRISOgas (helium)remote industrial, process heat, off-grid utility2027 (Mark-1 electricity-producing reactor at INL; Antares, Oct 23 2026)Idaho National Laboratory (Mark-0 criticality Jun 4 2026; Mark-1 planned for 2027); civilian site TBD

Radiant Nuclear

Kaleidos (portable microreactor)

1.2HALEU TRISOgas (helium)remote industrial, mining, off-grid utility, Arctic / remote-community power2026 (Kaleidos fueled experiment in the DOME test bed; DOE, May 23 2026)Idaho National Laboratory DOME test bed (conditionally selected Jul 1 2025; fueled experiment on track for 2026)

Westinghouse

eVinci microreactor

5HALEU TRISOheat pipe (sodium-potassium)remote industrial, process heat, university research, miningNot stated (conditionally selected for a DOME fueled test, Jul 1 2025)Idaho National Laboratory DOME test bed (conditionally selected Jul 1 2025)

NANO Nuclear Energy

Zeus (solid-core); ODIN (gas-cooled); KRONOS MMR pilot

5HALEU TRISOheat pipe (Zeus) / gas (ODIN) / FHR (KRONOS pilot)remote industrial, process heat, university campus (KRONOS pilot UIUC); aspirational data-center deploymentsaround 2030 (KRONOS MMR initial operation at UIUC; NANO 10-Q, Aug 12 2026); early 2030s commercial launchUniversity of Illinois Urbana-Champaign (KRONOS MMR construction permit application docketed May 18 2026); site TBD for Zeus / ODIN

Kairos Power

Hermes demo (35 MWth, ~10 MWe equivalent)

10HALEU TRISO (Flibe-cooled FHR fuel)molten salt (Flibe, fluoride-lithium-beryllium)utility grid (Hermes 2 will deliver up to 50 MW to the TVA grid for Google data centers under a power purchase agreement; Hermes 1 is a low-power test reactor)2028 (Kairos expects Hermes 1 construction to finish); 2030 (Hermes 2 begins operations; Kairos, Aug 18 2025)Oak Ridge, Tennessee (East Tennessee Technology Park)

Oklo

Aurora Powerhouse (15 MWe initial)

15HALEU metal fuel (U-10Zr alloy)liquid metal (sodium pool)utility grid, data center campus, remote industrial; commercial customer letters of intent total ~14 GWe (Equinix 500 MW MoU, Switch 12 GW MoU, Diamondback Energy, Wyoming Hyperscale)2028 (Oklo target; Oklo 10-Q, Aug 7 2026)Idaho National Laboratory (DOE site use permit)

Deployable Energy

Nuclear Unity Battery (1 MWe, company-stated)

1Not stated in the DOE or company releasesgas cooledNot stated in the DOE or company releasesZero-power criticality at INL on Jun 30 2026; selected for a full-power demonstration in the DOME test bed (company, Oct 7 2026)Idaho National Laboratory (NRIC zero-power test; DOME for the full-power demonstration)

First-of-a-Kind Commercial Operation Timeline

First-of-a-kind commercial-operation timeline for all 17 SMR and advanced-reactor developers, sorted by company-stated FOAK year. A disputed badge marks a company target that a regulator, a customer or the company's own later filing contradicts.

regulatory milestone
construction
operational / FOAK
disputed regulator, customer or own later filing contradicts company target
Developer
2025
2028
2031
2034
2037
2040
GE Vernova Hitachi Nuclear Energy

BWRX-300

Last Energy

PWR-20

Aalo Atomics

Aalo-1 / Aalo-X test article

Antares Industries

Mark-0 / Mark-1 microreactors (DOE pilot program)

Oklo

Aurora Powerhouse

KGHM Polska Miedźdisputed

NuScale NPM-20 SMR project

NuScale Powerdisputed

VOYGR 77 MWe

Holtec International

SMR-300

Westinghouse Electric

AP300

TerraPower

Natrium

X-energy

Xe-100 (Dow Seadrift)

Kairos Power

KP-FHR (Hermes demo)

NANO Nuclear Energy

KRONOS MMR

BWXT Advanced Technologies

BANR (civilian)

Rolls-Royce SMR

Rolls-Royce SMR 470 MWe

Radiant Nuclear

Kaleidos

Standard Nuclear (former USNC commercial assets)

TRISO fuel (no reactor design)

Ask Sterling

Register for a premium account to gain access to Sterling AI.

Get Started

Things you can ask Sterling:

Summarize Tesla's latest earnings reportWhy did NVIDIA's margins expand?Compare Apple vs Microsoft's cash flowWhat's driving EV industry growth?
Menu
Favorites
Nuclear SMRs & Advanced: Market Data | Sterling